STATE WATER RESOURCES CONTROL BOARD
BOARD MEETING SESSION -- DIVISION OF CLEAN WATER
PROGRAMS
MARCH 15, 2000
ITEM
3
SUBJECT
APPROVAL OF A STATE REVOLVING FUND (SRF) LOAN FOR THE CROCKETT – VALONA SANITARY DISTRICT (DISTRICT), WASTEWATER TRANSPORT SYSTEM IMPROVEMENTS, PHASES I, II, III, AND IV, SRF LOAN PROJECT NO. C-06-4675
DISCUSSION
In accordance with the State Water Resources
Control Board’s (SWRCB) Policy for
Implementing the SRF for Construction of Wastewater Treatment Facilities
(Policy), adopted on February 16, 1995, and amended on June 18, 1998, projects
on the adopted priority list need SWRCB approval to receive a SRF loan. Loans can be approved by the SWRCB after the
Division of Clean Water Programs (Division) has approved the facilities plan,
including (1) the project report; (2) the environmental documents; (3) the
draft revenue program; and (4) the water conservation plan.
On February 3, 2000, the Division issued
Facilities Plan Approval to the District for the wastewater transport system
improvements, Phases I, II, III, and IV, and the District agreed in writing
with the approval on February 7, 2000.
The District is located on the Southside of the San Pablo Bay near the South end of the Carquinez bridge. It provides wastewater collection and transport service to a population of approximately 3,200. The sewage is being treated at the Joint Treatment Plant which is partly owned by the District and managed and operated by the C&H Sugar Company. Treated effluent is being discharged to the Carquinez Strait according to San Francisco Bay Regional Water Quality Control Board’s (SFBRWQCB) waste discharge requirements, and Order No. 95-078.
The District’s wastewater collection and transport systems were constructed more than 60 years ago. The collection and transport systems have sewage overflow, inflow and infiltration, and grit removal problems. The District has been conducting studies and field investigation of the sewer systems since 1995. The Sewer System Evaluation Survey (Inflow/Infiltration Study) and Video Inspection of the trunk sewer showed that the following improvements are needed: (1) construct approximately 1,000 feet of interceptor sewer to relieve sewer overflows, (2) replace approximately 1,000 feet of deteriorated sewer to correct inflow and infiltration problems; (3) replace approximately 300 feet of the shoreline interceptor to correct tuberculation and inflow problems; and (4) upgrade the Main Pumping Station to reduce grit problems. Upon completion of these improvements, these problems will be reduced or eliminated within the District.
The domestic water supply for the District is
provided by the East Bay Municipal Utility District (EBMUD) which is a
signatory to the Memorandum of
Understanding Regarding Urban Water Conservation in California.
The District prepared
an Initial Study/Mitigated Negative Declaration which was distributed to the
public and circulated through the State Clearinghouse (SCH# 99112025) for
review from November 5, 1999, to December 3, 1999. During the review period the District received comments from the
Division, and from the Department of Toxic Substances Control. Environ-mental
issues were raised regarding hazardous materials, noise, air quality, wetlands,
and cultural resources. The District
considered the comments and provided adequate responses. The District Board of
Directors adopted the Mitigated Negative Declaration and approved the project
on December 15, 1999. The District
filed a Notice of Determination with the Governor’s Office of Planning and
Research on January 7, 2000.
The District has provided the Division with a
schedule for the submittal of final plans and specifications and other
milestones. These dates are contained
in the milestone schedule in the Division's facilities plan approval
letter. In accordance with Section
IX(J) of the SRF Policy, the resolution will include an expiration date for the
preliminary loan commitment if the milestone schedule for commencement of
construction is not met. The Division
may approve up to a 90-day extension for good cause.
The estimated construction cost for all four
phases of the project is $0.5 million, and the estimated loan eligible cost
(including allowance) is $0.7 million.
The District requests the SWRCB approve a loan of $0.7 million for this
project and agrees to pay back the loan in accordance with the SRF Policy.
POLICY ISSUE
Should the SWRCB approve SRF loan funding for
the proposed project, including a 20-year repayment period, with the first
repayment due one year after completion of construction? Should the SWRCB, in accordance with Section
IX(J) of the SRF Policy, condition this approval by requiring expiration of the
preliminary loan commitment if final plans and specifications are not submitted
by December 31, 2000.
SFBRWQCB. Completion of this project will improve the
District’s ability to comply with the SFBRWQCB’s requirements of reducing the
untreated wastewater overflows to the San Francisco Bay.
FISCAL
IMPACT
The SWRCB adopted Resolution No. 99-40 on May
20, 1999, which changed the method for determining the amount of funding
available for new loans to a system based on the availability of cash to make
disbursements to the project under consideration by the SWRCB. A minimum cash balance of $25,000,000 will
be maintained. The SRF account
balances, anticipated repayment amounts, and project approvals under consideration
by the SWRCB in March 2000 are as follows:
|
SFY |
SFY |
SFY |
SFY |
SFY |
|
1999-00 |
2000-01 |
2001-02 |
2002-03 |
2003-04 |
|
___________ |
__________ |
__________ |
_________ |
_________ |
Beginning
Balance: |
$518,269,168 |
$330,548,159 |
$149,849,199 |
$128,226,188 |
$149,804,767 |
Est.
Repayments:[1] |
75,859,855 |
91,170,889 |
102,198,380 |
118,379,704 |
141,975,512 |
Cap
Grants:[2] |
111,300,181 |
63,800,000[3] |
63,800,000 |
0 |
0 |
Est.
SMIF Interest: |
10,000,000 |
6,000,000 |
1,000,000 |
1,000,000 |
1,000,000 |
Est.
Disbursements:[4] |
-384,881,045 |
-315,969,849 |
-163,621,391 |
-72,801,125 |
-5,601,507 |
Subtotal: |
$330,548,159 |
$175,549,199 |
$153,226,188 |
$174,804,767 |
$287,178,772 |
|
|
|
|
|
|
City
of Santa Rosa 4062 |
|
-25,000,000 |
-25,000,000 |
-25,000,000 |
-25,000,000[5] |
Crockett-Valona
Sanitary D. 4675 |
|
-700,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance: |
$330,548,159 |
$149,849,199 |
$128,226,188[6] |
$149,804,767 |
$262,178,772 |
STAFF
RECOMMENDATION
The
SWRCB adopts a resolution approving a SRF loan for the proposed project, with a
repayment period up to 20 years, and with the first repayment due one year
after completion of construction. In accordance with the June 18, 1998, SRF
Policy, the proposed resolution includes an expiration date for this
preliminary loan commitment if the final plans and specifications are not
submitted by December 31, 2000.
_______________________________________________
DRAFT February 18, 2000
STATE WATER RESOURCES CONTROL BOARD
RESOLUTION NO. 2000-__
APPROVAL OF A STATE REVOLVING FUND LOAN
FOR WASTEWATER TREATMENT TRANSPORT SYSTEM
IMPROVEMENTS
PHASES I, II, III, and IV
CROCKETT - VALONA SANITARY DISTRICT (DISTRICT)
STATE REVOLVING FUND (SRF) LOAN PROJECT NO.
C-06-4675
WHEREAS:
1. The State Water Resources Control Board
(SWRCB), on February 16, 1995, adopted the Policy
for Implementing the State Revolving Fund for Construction of Wastewater
Treatment Facilities, and amended it on June 18, 1998;
2. The SWRCB, on June 17, 1999, adopted the SFY
1999/00 SRF Loan Program Priority List which included the wastewater transport
system improvements, Phases I, II, III, and IV, Crockett-Valona Sanitary
District, in Priority Class A;
3. The Division of Clean Water Programs has
approved the project report, environmental documents, and draft revenue
program;
4. The East Bay Municipal Utility District is
the water purveyor for the service area and is signatory to the Memorandum of Understanding Regarding Urban
Water Conservation in California; and
5. The District adopted an Initial
Study/Mitigated Negative Declaration (State Clearinghouse No. 99112025)
prepared for the project, which has been reviewed and considered and it has
been determined that the project will not result in any significant
environmental impacts.
THEREFORE BE IT
RESOLVED THAT:
The State Water
Resources Control Board
1. Approves a SRF loan of $0.7 million to the Crockett-Valona
Sanitary District for construction of the wastewater transport system
improvements, Phases I, II, III, and IV, with a repayment period up to 20
years, and the first repayment due one year after completion of construction;
and
2. Will withdraw this preliminary SRF loan
commitment if final plans and specifications are not submitted by December 31,
2000. The Division may approve up to a
90-day extension for good cause.
CERTIFICATION
The
undersigned, Administrative Assistant to the Board, does hereby certify that
the foregoing is a full, true, and correct copy of a resolution duly and
regularly adopted at a meeting of the State Water Resources Control Board held
on March 15, 2000.
Maureen
Marché
Administrative
Assistant to the Board
[1] Est. repayments include
repayments from existing loans and from loans expected to be executed in the
next few years for projects with existing commitments.
[2] An EPA Capitalization Grant of
$95,948,432 for SFY 2000 is anticipated (the final 0.38% reduction in the
federal budget is not approved at this time) plus State match funds of
$19,189,686. $3,837,937 is deducted for
administrative costs.
[3] An EPA Capitalization Grant
of $55,000,000 for SFY’s 2001 and 2002 is forecast. The 20% state match as added and the 4% administrative allowance
is deducted.
[4] Estimated disbursements
include disbursements remaining on existing loans as well as disbursements
anticipated on loans executed for projects with existing commitments (including
FY2000 commitments). The Division will
revise the estimated disbursements total each month as cash draw forecasts are
updated.
[5] Total project cost estimated
to be $101,000,000. Maximum loan amount
is capped at $25,000,000 per year.
Final year’s commitment of $1,000,000 in SFY 2004-05 is not shown for
clarity.
[6] The cash balance on June 30, 2002, is estimated to be $103,226,188 above the level needed to maintain a $25,000,000 reserve.