Welcome to the State Water Resources Control Board Welcome to the California Environmental Protection Agency
Governor's Website Visit the Water Board Members Page
Agendas
My Water Quality
Performance Report
PERFORMANCE REPORT The Water Boards...

State Water Board Logo

The California Water Boards' Annual Performance Report - Fiscal Year 2010-11

REGULATE: NPDES STORMWATER

Display a PDF version of this page for easy printing
GROUP: NPDES STORMWATER
MUNICIPAL FACILITIES
MEASURE: NUMBER OF INSPECTIONS
NUMBER OF FACILITIES INSPECTED
MESSAGE:   Stormwater Municipal inspections account . . . . ..

MEASUREMENTS

 

 

WHAT THE MEASURE IS SHOWING

The program conducted 3,047 inspections at 2,640 facilities. This is the largest number of inspections conducted by any program statewide. R8 in particular, conducted almost half of the inspections with 28% of its currently enrolled facilities inspected. Some facilities are inspected more than once a year, which is why the total number of inspections is greater than the total number of facilities inspected.

WHY THIS MEASURE IS IMPORTANT

Inspections are the primary tool used in the NPDES Stormwater program to assess compliance with NPDES requirements. The stormwater municipal program is unique in that the industrial activity (construction, land disturbance) is temporary in nature. Other industrial activities tend to be more long term (e.g., cement manufacturing, auto dismantling). As a result, it is critical to inspect construction facilities during the actual construction activity. Most construction sites follow a process of (1) Grading and Land Development Phase, (2) Streets and Utilities Phase, (3) Vertical Construction Phase, and (4) Post Construction Phase. The type of storm water controls varies depending on the phase of construction. It is also helpful to inspect a construction site during both wet and dry weather periods to determine permit compliance. For all of these reasons, the storm water program considers inspection of construction facilities a high priority.

TECHNICAL CONSIDERATIONS

GLOSSARY

Construction Stormwater Program
 
Dischargers whose projects disturb one or more acres of soil or are part of a larger common plan of development that in total disturbs one or more acres, are required to obtain coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity (Construction General Permit, 2009-0009-DWQ).
 
 
 
 
 

General Permit
An NPDES permit issued under 40 CFR 122.28 that authorizes a category of discharges within a geographical area. A general permit is not specifically tailored for an individual discharger.

National Pollutant Discharge Elimination System (NPDES)
The NPDES permit program (Section 402 of the Clean Water Act) controls water pollution by regulating point sources that discharge pollutants into waters of the United States. Point sources are discrete conveyances such as pipes or man-made ditches. Individual homes that are connected to a municipal system, use a septic system, or do not have a surface discharge do not need an NPDES permit; however, industrial, municipal, and other facilities must obtain permits if their discharges go directly to surface waters. US EPA has approved the Water Board’s program to issue NPDES permits.

( Page last updated:  9/19/11 )

 
 

.