The California Water Boards' Annual Performance Report - Fiscal Year 2014-15
REGULATE: NPDES STORMWATER FACILITIES |
|
|
||||
|
|
MEASUREMENTS
|
FusionCharts will load here
|
FusionCharts will load here
WHAT THE MEASURE IS SHOWING
WHY THIS MEASURE IS IMPORTANT
TECHNICAL CONSIDERATIONS
- Data Source: Stormwater Multi-Application, Reporting, and Tracking System (SMARTS).
- Unit of Measure: Number of facilities discharging under an active storm water NPDES general permit.
- Data Definitions: Permits Active.
- References: Information on the Water Boards' NPDES Storm Water Program
- Public Reports and Data
GLOSSARY
- Construction Stormwater Program
-
Dischargers whose projects disturb one or more acres of soil or whose projects disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres, are required to obtain coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity Construction General Permit Order 2009-0009-DWQ. Construction activity subject to this permit includes clearing, grading and disturbances to the ground such as stockpiling, or excavation, but does not include regular maintenance activities performed to restore the original line, grade, or capacity of the facility.
- Industrial Stormwater Program
- Discharges associated with 10 broad categories of industrial activities are regulated under the Industrial Storm Water General Permit Order 97-03-DWQ (General Industrial Permit), which is an NPDES permit.
- Municipal Stormwater Phase I Facilities
- The Municipal Storm Water Permits regulate storm water discharges from municipal separate storm sewer systems (MS4s). Under Phase I, which began in 1990, the Regional Water Boards have issued NPDES MS4 permits to permittees serving populations greater than 100,000 people. Many of these permits are issued to a group of co-permittees encompassing an entire metropolitan area. These permits are reissued as the permits expire.
- Municipal Stormwater Phase II Facilities
- Under Phase II, the State Water Board adopted a General Permit for the Discharge of Storm Water from Small MS4s (WQ Order No. 2003-0005-DWQ) to provide permit coverage for smaller municipalities (10,000 to 100,000 people), including non-traditional small MS4s which are governmental facilities such as military bases, public campuses, prisons and hospital complexes.