Central Valley Regional Water Board Performance Summary1
Percentage of Targets Met
Area: 59344 square miles Budget: $38,734,209 Staff: 244.7
Permitting 100% Inspections 89% Others 50%
1Regional Board performance summary statistics show the percentage of targets met.
 
Total Maximum Daily Load and Basin Planning
Program Budget: $2,422,266 Program Staff: 19.10
  Target Actual Achieved % of Targets Met
Pollutant/Water Body Combinations Addressed 15 0 0%
Total Maximum Daily Loads Adopted 1 0 0%
Basin Plan Amendments Adopted 2 3 150%
Adoption of a pyrethroid TMDL—that will address 15 pollutant/water body combinations—was delayed until FY15/16 in order to allow consideration of new toxicity evaluation data that became available in January 2015. The two basin planning targets for FY2014-15 were the amendments for de-designating Municipal and Domestic Supply (MUN) in the 12 Sacramento River Basin water bodies and the pyrethroids control program. Staff did not bring the pyrethroid control program to the Board for its consideration in order to incorporate new toxicological information that became available late during the fiscal year. However, the Board approved the amendments for de-designating MUN in the 12 water bodies and also approved two triennial review actions related to developing basin planning work plans for the Central Valley.
NPDES Wastewater
Program Budget: $3,533,893 Program Staff: 25.20
  Target Actual Achieved % of Targets Met
Major Individual Permits Issued or Renewed 8 13 163%
Major Individual Facilities Inspected 22 24 109%
Minor Individual Permits Issued or Renewed 16 16 100%
Minor Individual Facilities Inspected 10 23 230%
Minor General Facilities Inspected 0 101  
Region 5 renewed 9 major permits and amended 4 permits in fiscal year 2014-15. The additional inspections of Minor Facilities represent unscheduled inspections of Cleanup sites with NPDES permits and responses to complaints.
NPDES Stormwater
Program Budget: $1,287,151 Program Staff: 10.40
  Target Actual Achieved % of Targets Met
Municipal (Phase I/II Inspections) 0 0  
Construction Inspections 385 513 133%
Industrial Inspections 195 213 109%
Additional inspections were conducted to accommodate requests by permittees for enrollment terminations and in response to complaints.
Waste Discharge to Land Wastewater
Program Budget: $3,623,433 Program Staff: 25.70
  Target Actual Achieved % of Targets Met
Waste Discharge to Land Inspections 183 237 130%
Individual Waste Discharge Requirements Issued or Updated 32 37 116%
The Central Valley Water Board is placing a higher emphasis on enrollments of dischargers under General Orders and Waivers to eliminate the backlog of older Waste Discharge Requirements. Over 80 enrollments under General Orders or waivers were made in the 2014-15 fiscal year. The excess number of permits adopted includes a number of amendments that were not included in the original performance target. The number of inspections conducted includes Oil and Gas Extraction Facility inspections that were not accounted for in development of this performance metric.
Land Disposal
Program Budget: $3,174,929 Program Staff: 21.50
  Target Actual Achieved % of Targets Met
Landfill Individual Permits Issued or Updated 9 8 89%
Landfill Inspections 83 150 181%
Land Disposal All Other Individual Permits Issued or Updated 7 7 100%
Land Disposal All Other Inspections 52 34 65%
Although the total number of inspections (150) exceeded the targeted inspections, the number of facilities inspected (93) was only slightly greater than the anticipated number of facilities inspected (83), which was the original metric. The number of return inspections represents large facilities that required multiple inspections, and confirmation inspections to ensure that violations were addressed. Although the total number of inspections (150) exceeded the targeted inspections, the number of facilities inspected (93) was only slightly greater than the anticipated number of facilities inspected (83), which was the original metric. The number of return inspections represents large facilities that required multiple inspections, and confirmation inspections to ensure that violations were addressed.
Confined Animal Facilities (WDR, NPDES, etc.)
Program Budget: $1,575,522 Program Staff: 11.80
  Target Actual Achieved % of Targets Met
Confined Animal Facilities Inspections 350 443 127%
Because of a delay in the effort to issue General Orders for feedlots and poultry facilities, resources were diverted to conduct additional compliance inspections.
Timber Harvest (Forestry)
Program Budget: $1,480,783 Program Staff: 11.10
  Target Actual Achieved % of Targets Met
Timber Harvest Inspections 160 243 152%
Forest Activities Program (FAP) targets were exceeded due to increased inspections of post-fire assessments and logging activities.
Enforcement
Program Budget: $878,811 Program Staff: 6.00
  Target Actual Achieved % of Targets Met
Class 1 Priority Violations will Result in Formal Enforcement or an Investigative Order Pursuant to Water Code Section 13267 within 18 Months of Discovery 100 100 100%
Facilities with Over $12,000 in MMPs (4 or More Violations) Not Assessed within 18 Months of Accrual 0 4        
The facilities with more than 4 MMPs that have gone 18 months without formal enforcement represent complicated settlements with disadvantaged communities and, also, cases where additional discretionary enforcement is being combined with MMP enforcement. It is anticipated that these cases will be resolved with formal enforcement in 2016. Overall, Region 5 staff are addressing better than 99% of all MMP violations with formal enforcement within 18 months of the violations.
Cleanup
Program Budget: $5,646,411 Program Staff: 31.10
  Target Actual Achieved % of Targets Met
New Department of Defense Sites Into Active Remediation 56 43 77%
Cleanup Sites Closed 42 50 119%
New Underground Storage Tank Sites Into Active Remediation 59 64 108%
Underground Storage Tank Sites Projected Closed 103 106 103%
New Cleanup Sites Moved into Active Remediation 80 37 46%
Forty-eight sites were predicted to go into active remediation in FY 2014-15 pending the finalization of Aerojet Operable Unit #6 Record of Decision (RoD). The RoD was subsequently finalized in July 2015 and the Cleanup Program is well on way to meeting the metric for FY2015-16.