STATE
WATER RESOURCES CONTROL BOARD
WORKSHOP
SESSION – DIVISION OF CLEAN WATER PROGRAMS
NOVEMBER
3, 1999
APPROVAL OF A STATE
REVOLVING FUND (SRF) LOAN FOR THE COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC
WORKS (COUNTY) FOR THE MALIBU WATER POLLUTION CONTROL PLANT REHABILITATION
PROJECT, SRF LOAN PROJECT
NO. C-06-4498-110
In accordance with the State Water Resources
Control Board's (SWRCB) Policy for
Implementing the State Revolving Fund for Construction of Wastewater Treatment
Facilities (Policy), adopted on February 16, 1995, and amended on June 18,
1998, projects on the adopted Statewide priority list need SWRCB approval to
receive a SRF loan. Pursuant to SRF
Policy Section IV.E.3, the Statewide priority list may be adjusted or amended
by the SWRCB at any time for good cause subject to approval by Environmental
Protection Agency. Loans can be
approved by the SWRCB after the Division of Clean Water Programs (Division) has
approved the facilities plan, including (1) the project report; (2)
environmental documents; (3) the draft revenue program; and (4) the water
conservation plan.
On August 27, 1999, the Division issued
Facilities Plan Approval to the County for construction of the Malibu Water
Pollution Control Plant Rehabilitation Project, and the County agreed in
writing with the approval on September 27, 1999.
The Malibu Water Pollution Control Plant (MWPCP)
is located in the City of Malibu on the coast of the Pacific Ocean in the
County of Los Angeles. The MWPCP is
operated by the County for the Malibu Zone of the Consolidated Sewer
Maintenance District. The MWPCP
currently serves a 169 condominium unit complex and has a design capacity of
37,500 gallons per day . The plant effluent
is disposed in seepage pits and the waste sludge is hauled to the City of Los
Angeles or the County Sanitation Districts of Los Angeles County for treatment
and disposal.
The MWPCP is over 30 years old and in need of
major rehabilitation. The plant has
been out of compliance with its Waste Discharge Requirements (WDR’s) because it
has exceeded its design flow and because the minimum vertical separation
between the bottom of the seepage pits and groundwater table cannot be
maintained during wet weather season.
Additionally, 75 percent of the plant’s seepage pit capacity has been
taken out of service due to high groundwater and plugging problems.
On November 2, 1998, the Los Angeles Regional Water
Quality Control Board (LARWQCB) issued new WDR’s which require more stringent
treatment and a revised monitoring and reporting program.
The County’s design engineer has determined that
the cost effective project to address these problems consists of replacement of
the headworks, a new extended aeration package plant, new filters, electrical
system upgrade, a disinfection system, four new seepage pits, effluent
monitoring equipment, and operator facilities.
In addition to the rehabilitation and upgrade project, the plant will be
expanded to accommodate a new 22 unit condominium complex.
The new plant would be able to accommodate the
average and peak flows of the expanded service area and would meet the
requirements of the LARWQCB WDR’s for improved treatment. Because the effluent will be filtered and
disinfected, the minimum vertical separation to groundwater will no longer be
required, and the plugging problem in the seepage pits should be eliminated.
The County has provided the Division with a milestone
schedule containing a submittal date for the biddable Plans and Specifications
(P&S) of January 4, 2000. In
accordance with the SRF Policy Section IX.(I), the sunset date for biddable
P&S submittal is hereby established as January 4, 2000. The Division may approve up to a 90 day time
extension of this date for good cause.
Domestic water to the service area is provided
by the Los Angeles County Waterworks District No. 29. The District purchases 100 percent of its water supply from the
Metropolitan Water District of Southern California through the West Basin
Municipal Water District. The water
supply is a blend of Colorado River Aqueduct and California Aqueduct. The same water source will continue to
supply potable water to all users within District No. 29. The Los Angeles County Waterworks Districts,
a Division of the Los Angeles County Department of Public Works is a signatory
to the “Memorandum of Understanding Regarding Urban Water Conservation in California”,
and therefore meets the SRF Policy requirements for water conservation.
The County prepared a Negative
Declaration/Initial Study for the proposed project which was distributed to the
public and circulated through the State Clearinghouse (SCH #99041082) for
review from April 20, 1999, through May 20, 1999. During the review period, the County received comments from two
public agencies. The County Board of
Supervisors considered the comments, approved the project, and adopted the
Negative Declaration on June 22, 1999.
The County filed a Notice of Determination with the Los Angeles County
Clerk and Governor’s Office of Planning and Research on June 30, 1999.
The estimated SRF loan
eligible project cost is $860,000. The
County requests the SWRCB approve a loan of $860,000 for this project and
agrees to pay back the loan in accordance with the SRF Policy.
1.
Should
the SWRCB approve SRF loan funding for the proposed project, including a 20
year period for repayment, with the first repayment due one year after
completion of construction?
2. Should the SWRCB condition this approval by
requiring expiration of the preliminary loan commitment if biddable P&S are
not submitted by January 4, 2000?
LARWQCB. The project will enable the County to meet the
new LARWQCB discharge requirements by providing expanded and upgraded
facilities, and advanced treatment of effluent. The new WDR’s are consistent with the LAWRQCB basin plan.
FISCAL
IMPACT
The SWRCB adopted Resolution No. 99-40 on May 20, 1999, which changed the method for determining the amount of funding available for new loans to a system based on the availability of cash to make disbursements to the project under consideration by the SWRCB. A minimum cash balance of $25,000,000 will be maintained. The SRF account balances, anticipated repayment amounts, and project approvals under consideration by the SWRCB in November 1999 are as follows:
|
SFY |
SFY |
SFY |
SFY |
SFY |
|
1999-00 |
2000-01 |
2001-02 |
2002-03 |
2003-04 |
|
___________ |
__________ |
__________ |
_________ |
_________ |
Beginning
Balance: |
$517,428,413 |
$318,201,877 |
$123,383,215 |
$62,771,438 |
$111,822,255 |
Est.
Repayments:[1] |
73,959,359 |
92,267,142 |
102,320,609 |
118,288,293 |
145,490,205 |
Cap
Grants:[2] |
112,520,000 |
0 |
0 |
0 |
0 |
Est.
SMIF Interest: |
10,000,000 |
6,000,000 |
1,000,000 |
1,000,000 |
1,000,000 |
Est.
Disbursements:[3] |
-389,505,895 |
-279,325,804 |
-161,532,386 |
-70,237,476 |
-0 |
Subtotal: |
$324,401,877 |
$137,143,215 |
$65,171,438 |
$111,822,255 |
$258,312,460 |
L.A.
County – Malibu Tmt 4498-110 |
|
-860,000 |
|
|
|
City
of American Canyon 4666-110 |
-2,400,000 |
-7,200,000 |
-2,400,000 |
|
|
Town
of Windsor
4704-110 |
-3,800,000 |
-5,700,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance: |
$318,201,877 |
$123,383,215 |
$62,771,438[4] |
$111,822,255 |
$258,312,460 |
[1] Est. repayments include repayments from existing loans and from loans expected to be executed in the next few years for projects with existing commitments.
[1] An EPA Capitalization Grant of $97,000,000 for SFY 2000 is anticipated (the federal budget is not approved at this time) plus State match funds of $19,400,000. $3,880,000 is deducted for administrative costs.
[1] Estimated disbursements includes disbursements remaining on existing loans as well as disbursements anticipated on loans executed for projects with existing commitments (including FY2000 commitments). The Division will revise the estimated disbursements total each month as cash draw forecasts are updated.
[1]
The cash balance on June 30, 2002, is estimated to be $37,771,438 above the
level needed to maintain a $25,000,000 reserve.
STAFF RECOMMENDATION
That the SWRCB adopt a
resolution approving a SRF loan of $860,000 for the proposed project, with a
repayment period of 20 years, and with the first repayment due one year after
completion of construction. In
accordance with Section IX.(I) the February 16, 1995, SRF Policy amended on
June 18, 1998, the proposed resolution includes an expiration date for this
preliminary loan commitment if biddable P&S are not submitted by January 4,
2000.
_______________________________________________________________________________________________
DRAFT
October 25, 1999
STATE WATER RESOURCES CONTROL BOARD
RESOLUTION NO. 99-__
APPROVAL OF A STATE REVOLVING FUND (SRF) LOAN FOR THE COUNTY
OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS (COUNTY) FOR THE
MALIBU WATER POLLUTION CONTROL PLANT REHABILITATION PROJECT,
SRF LOAN PROJECT NO. C-06-4498-110
WHEREAS:
1. The State Water Resources Control Board (SWRCB), on February 16,
1995, adopted the “Policy for
Implementing the State Revolving Fund for Construction of Wastewater Treatment
Facilities,” and revised it on June 18, 1998;
2. The SWRCB, on June 2, 1999, adopted the Federal Fiscal Year (FFY)
1999/2000 SRF Loan Program Priority List, which included the Upgrades at Malibu
Treatment Plant project in Priority Class B;
3. The Division of Clean Water Programs (Division) has approved the
facilities plan;
4. The County is signatory to the “Memorandum of Understanding
Regarding Urban Water Conservation in California”; and
5. The County adopted a Negative Declaration
for the proposed project (State Clearinghouse No. 99041082) which has been
reviewed and considered, and it has been determined that the proposed project
will not result in significant negative environmental impacts.
THEREFORE BE IT RESOLVED THAT:
The State Water Resources Control Board:
1.
Approves a SRF loan of $860,000 to the County of Los Angeles Department
of Public Works for the construction of the Malibu Water Pollution Control
Plant Rehabilitation Project. The
repayment period shall be 20 years, and the first repayment due one year after
completion of construction, and
2. Will withdraw this preliminary SRF loan
commitment if biddable Plans and Specifications are not submitted by January 4,
2000. The Division may approve up to a
90 day time extension for good cause.
CERTIFICATION
The undersigned, Administrative Assistant to the
Board, does hereby certify that the foregoing is a full, true, and correct copy
of a resolution duly and regularly adopted at a meeting of the State Water
Resources Control Board held on November 18, 1999.
Maureen
Marché
Administrative
Assistant to the Board
[1] Est. repayments include repayments from existing loans and from loans expected to be executed in the next few years for projects with existing commitments.
[2] An EPA Capitalization Grant of $97,000,000 for SFY 2000 is anticipated (the federal budget is not approved at this time) plus State match funds of $19,400,000. $3,880,000 is deducted for administrative costs.
[3] Estimated disbursements includes disbursements remaining on existing loans as well as disbursements anticipated on loans executed for projects with existing commitments (including FY2000 commitments). The Division will revise the estimated disbursements total each month as cash draw forecasts are updated.
[4] The cash balance on June 30, 2002, is estimated to be $37,771,438 above the level needed to maintain a $25,000,000 reserve.