The California Water Boards' Annual Performance Report - Fiscal Year 2013-14
State Board | Region 1 | Region 2 | Region 3 | Region 4 | Region 5 | Region 6 | Region 7 | Region 8 | Region 9
TARGETS AND RESOURCES: REGION 5 CENTRAL VALLEY |
|
GROUP: TARGETS AND RESOURCES - REGION 5 |
MEASURE: ALL REGIONAL TARGETS ALL RESOURCES |
Targets Achieved: |
Central Valley Regional Water Board Performance Summary | Percentage of Targets Met |
||
Area: 59344 square miles | Budget: $32,102,492 | Staff: 223.6 | |
Permitting 60% • | Inspections 80% • | Others 70% • | |
Total Maximum Daily Load and Basin Planning | |||||
Program Budget: $2,236,225 | Program Staff: 18.60 | ||||
Target | Actual Achieved | % of Targets Met | |||
Pollutant/Water Body Combinations Addressed | 47 | 47 | 100% • | ||
Total Maximum Daily Loads Adopted | 1 | 1 | 100% • | ||
Basin Plan Amendments Adopted | 4 | 7 | 175% • | ||
No Regional Board Considerations Provided | |||||
NPDES Wastewater | |||||
Program Budget: $3,561,720 | Program Staff: 25.20 | ||||
Target | Actual Achieved | % of Targets Met | |||
Major Individual Permits Issued or Renewed | 9 | 17 | 189% • | ||
Major Individual Facilities Inspected | 51 | 29 | 57% • | ||
Minor Individual Permits Issued or Renewed | 19 | 18 | 95% • | ||
Minor Individual Facilities Inspected | 7 | 10 | 143% • | ||
Minor General Facilities Inspected | 0 | 1 | N/A | ||
Target reflects the use of contractor help that was not available during FY 13/14. | |||||
NPDES Stormwater | |||||
Program Budget: $1,207,990 | Program Staff: 10.40 | ||||
Target | Actual Achieved | % of Targets Met | |||
Municipal (Phase I/II Inspections) | 5 | 8 | 160% • | ||
Construction Inspections | 385 | 654 | 170% • | ||
Industrial Inspections | 195 | 243 | 125% • | ||
No Regional Board Considerations Provided | |||||
Waste Discharge to Land Wastewater | |||||
Program Budget: $3,395,431 | Program Staff: 25.70 | ||||
Target | Actual Achieved | % of Targets Met | |||
Waste Discharge to Land Inspections | 174 | 220 | 126% • | ||
Individual Waste Discharge Requirements Updated | 36 | 26 | 72% • | ||
The region experienced a vacancy of a key position mid-way through the fiscal year, received and processed a higher than anticipated number of applicants for general order enrollments (112 vs. 45), and increased its field presence in oil fields. | |||||
Land Disposal | |||||
Program Budget: $2,973,618 | Program Staff: 21.50 | ||||
Target | Actual Achieved | % of Targets Met | |||
Landfill Individual Permits Updated | 9 | 18 | 200% • | ||
Landfill Inspections | 73 | 150 | 205% • | ||
All Other Individual Permits Updated | 5 | 1 | 20% • | ||
All Other Inspections | 48 | 28 | 58% • | ||
Staff in Sacramento were redirected from permits to assist with two complex Cleanup and Abatement Orders (CAOs) for mines. Cleanup and Abatement Orders are not counted towards permit performance targets in the Land Disposal program. Staff inspected multiple unregulated facilities, but those sites are not included in the inspection counts. | |||||
Confined Animal Facilities (WDR, NPDES, etc.) | |||||
Program Budget: $1,477,285 | Program Staff: 11.80 | ||||
Target | Actual Achieved | % of Targets Met | |||
Confined Animal Facilities Inspections | 350 | 496 | 142% • | ||
No Regional Board Considerations Provided | |||||
Timber Harvest (Forestry) | |||||
Program Budget: $1,379,065 | Program Staff: 11.10 | ||||
Target | Actual Achieved | % of Targets Met | |||
Timber Harvest Inspections | 120 | 180 | 150% • | ||
No Regional Board Considerations Provided | |||||
Enforcement | |||||
Program Budget: $894,131 | Program Staff: 6.00 | ||||
Target | Actual Achieved | % of Targets Met | |||
Class 1 Priority Violations will Result in Formal Enforcement or an Investigative Order Pursuant to Water Code Section 13267 within 18 Months of Discovery | 100 | 63 | 63% • | ||
Facilities with Over $12,000 in MMPs (4 or More Violations) Not Assessed within 18 Months of Accrual | 0 | 5 | 0% • | ||
The target for “Facilities with 4 or more MMP violations Not Assessed within 18 Months of Accrual” is 0, actual achieved column shows number not addressed within 18 months. Number of facilities with 4 or more MMP violations that were addressed within 18 is not shown. RB5 staff are continuing to make improvements towards tracking violations--particularly the Class 1 violations--utilizing the State's CIWQS database. Enforcement staff at RB5 will continue to work with State Board staff to ensure that all Class 1 violations identified in CIWQS are responded to within 18 months. The five facilities identified as having four or more MMPs older than 18 months and not yet addressed are: Collins Pine (NOV issued 21 August 2014; received response 19 September 2014; issuance of ACL is pending); Pacific Sprouts (ACL issued 8 September 2014); Original 16-1 Mine (referred to AG's office); Atwater Regional WWTF (ACL to be issed 30 September 2014); and Stallion Springs WWTF (ACL to be issued 31 October 2014). | |||||
Cleanup | |||||
Program Budget: $5,343,525 | Program Staff: 31.00 | ||||
Target | Actual Achieved | % of Targets Met | |||
New Department of Defense Sites Into Active Remediation | 63 | 60 | 95% • | ||
Cleanup Sites Closed | 140 | 50 | 36% • | ||
New Underground Storage Tank Sites Into Active Remediation | 45 | 55 | 122% • | ||
Underground Storage Tank Sites Projected Closed | 105 | 127 | 121% • | ||
New Cleanup Sites Moved into Active Remediation | 36 | 41 | 114% • | ||
94 DoD closures were inadvertently included in the target estimate. The Private Site Closure target was estimated at 46, which was achieved (50). | |||||
RESOURCES (INPUTS)
Region 5 (Central Valley) | FY 13-14 Budget ($) |
Staff (PY) | %Fees/Taxes Penalties |
%Federal | %General Fund/Other |
%Bonds |
---|