Carlsbad Desalination Plant Appendices to the Report of Waste Discharge
List of Appendices to the ROWD
ROWD Appendices submitted on September 4, 2015
- Appendix A - Compliance with Ocean Plan Amendments (Errata in Appendix JJ below)
- Appendix B - Intake Discharge Feasibility Report (Addendum in Appendix II below)
- Appendix C - Hydrodynamic Discharge Study
- Appendix D - Coastal Process Effects of Reduced Intake
- Appendix E - NPDES Order No. R9-2011-0028
- Appendix F - Water Circulation in Agua Hedionda Lagoon
- Appendix G - Acute Toxicity Study
- Appendix H - Chronic Toxicity Study
- Appendix I - Brine Dilution Salinity Tolerance
- Appendix J - Fish-Friendly Pumping
- Appendix K - Intake/Discharge Entrainment Analysis
- Appendix L - CFD Modeling of Flow Augmentation System
- Appendix M - Anti-degradation Analysis
- Appendix N - Life Cycle Cost Analysis (Revised in Appendix OO below)
- Appendix O - NPDES Order No. R9-2009-0038
- Appendix P - Flow, Entrainment, Impingement Minimization Plan
- Appendix Q - Final EIR
- Appendix R - California Coastal Commission Approval of Marine Life Mitigation Plan
- Appendix S - Hydro-geologic Investigation SDG&E Encina Power Plant, Carlsbad, CA
- Appendix T - Drought Proofing Through Desalting the SDG&E Approach
- Appendix U - Huntington Beach Desalination Project, ISTAP Phase I & II Reports
- Appendix V - U.S. Fish and Wildlife Service MOU
- Appendix W - SDCWA 2010 Urban Water Management Plan and 2013 Facilities Master Plan Update
- Appendix X - Construction Cost Estimates for Intake/Discharge Alternatives
- Appendix Y - Implementation Schedules for Intake/Discharge Alternatives
- Appendix Z - Proposed Monitoring and Reporting Plan
ROWD Appendices submitted on August 18, 2016
- Appendix AA - California Coastal Commission Approval of CDP
- Appendix BB - Revised hydrodynamic Discharge Modeling Report
- Appendix CC - Encina Wastewater Authority Response to Request for Information regarding the Encina Ocean Outfall as a Brine Discharge Alternative for the Carlsbad Desalination Plant
- Appendix DD - Analysis of Potential for CDP Discharge to Cause Hypoxic Conditions
- Appendix EE - Comparison of Fish Return Options
- Appendix FF - Fish Return System Cleaning Methods
- Appendix GG - Larval Fish Residence Time in Agua Hedionda Lagoon
- Appendix HH - Entrapment Evaluation
- Appendix II - Addendum to Intake Discharge Feasibility Report
- Appendix JJ - Appendix A Errata
- Appendix KK - Draft Final SEIR
- Appendix LL - Draft Response to Comments
- Appendix MM - Draft Findings of Fact
- Appendix NN - Draft Mitigation Monitoring and Reporting Program
- Appendix OO - Revised Life Cycle Cost Analysis
- Appendix PP - Intake/Discharge Design Modifications
ROWD Appendices submitted after August 18, 2016
- Appendix QQ - Response to Questions Regarding CDP Discharge Modeling Reports (Revised February 21, 2017)
- Appendix RR - Feasibility Assessment of Alternative Brine Discharge to the Encina Ocean Outfall
- Appendix SS - Feasibility Assessment of Wedge Wire Screen (WWS) Intake in Agua Hedionda Lagoon
- Appendix TT - Fish Return System Discharge Location Alternatives Analysis
- Appendix UU - Brine Mixing Zone Habitat Assessment (Revised January 18, 2017)
- Appendix VV - Establishing the Location of the Zone of Initial Dilution for Stand-Alone Operation (Revised March 14, 2017)
- Appendix WW - Brine Discharge Mortality Calculations
- Appendix XX - Current and 2065 Area BMZ and Wetlands Restoration Project
- Appendix YY - Marine Life Mortality Comparison between the Proposed Screening Location and the Lagoon Screen Locations
- Appendix ZZ - Marine Life Mortality Report and Mitigation Calculation (Rev. 1)
- Appendix AAA - Fish Return Anti-degradation
- Appendix BBB - Evaluation of Intake Alternatives 1, 15-20
- Appendix CCC - Evaluation of Intake Alternatives 1, 11-14
- Appendix DDD - Feasibility Assessment of Carlsbad Desalination Plant Intake and Discharge
- Appendix EEE - Revised Feasibility Assessment for Intake Alternatives 1, 15, and 21
- Appendix FFF - Revised Area of Production Foregone Calculations
- Appendix GGG - Revised Entrainment Analysis for Brine Discharge Options
- Appendix HHH - Relative Salinity Impacts in the BMZ for Variable Discharge Rates