Public Notices and Documents for Review
The San Francisco Bay Regional Water Quality Control Board (Water Board) requests public comments on many types of draft documents: Basin Plan amendments, adoption of TMDLs (Total Maximum Daily Loads), NPDES permits, Waste Discharge Requirements, Site Cleanup Requirements, Enforcement Orders, California Environmental Quality Act documents and more. This page contains links to public notices for projects currently in a public comment period. In addition, you will find links to pages containing support materials (fact sheets, regulation text, etc.) below the public notices.You may also visit the Water Board Meeting Calendar for information about comment periods, public hearings and meetings.
Decisions
- Board Meetings
- Basin Planning and TMDLs
- Agriculture
- NPDES
- Enforcement Actions
- Proposed (Tentative) Orders for Consideration by the Board
- Site Cleanup
- Section 401 Water Quality Certification
- Storm Water
- Onsite Wastewater Treatment Systems
- Waste Discharge Requirements
Laws and Regulations Relevant to Current Public Proceedings
- California Water Code
- California Code of Regulations
- Title 23. Waters
- Title 27. Environmental Protection
How to Participate
Board Meetings
Basin Planning and TMDLs
NEW - DECEMBER 11 HEARING POSTPONED FOR THE 2024 TRIENNIAL REVIEW
The San Francisco Bay Regional Water Board has received and accepted two late letters raising substantive concerns about the Triennial Review. Staff needs additional time to consider these concerns. Therefore, the public hearing and action on the 2024 Triennial Review, scheduled for December 11, 2024, have been postponed.
Updates on the rescheduled hearing will be noticed by an email distribution list. Any person desiring to receive future notices must sign up for and remain on the email distribution list, and select the box for the “ALL Basin Planning/TMDL Notices and Information” option in the section on Basin Planning and TMDLs.
Questions and comments may be directed to Gerardo Martinez at (510) 622-1015 or Gerardo.Martinez@waterboards.ca.gov.
Agriculture
NPDES
- For public notices and draft documents for review on NPDES related matter, please see Proposed (Tentative) Orders for Consideration by the Board.
Onsite Wastewater Treatment Systems
Site Cleanup
Site Cleanup Requirement Rescission for The Former East Palo Alto Area, for 29 properties located within the boundaries of what was formerly known as the East Palo Alto Industrial Area (EPAIA) and/or the Ravenswood Industrial Area (RIA) in East Palo Alto, San Mateo County.
Section 401 Water Quality Certification
Comment Period | Project Name | City/County |
12/3/2024 - 12/22/2024 | Rick Ali Wetland Restoration at 345 Silverado Trail, Calistoga | Calistoga, Napa County |
12/4/2024 - 12/23/2024 | R-1742 L-191 MP 9.4-10.6 Retire Pipe Project | Pittsburg, Contra Costa County |
12/5/2024 - 12/24/2024 | Vineyard Pipeline Emergency Repair | Pleasanton, Alameda County |
12/5/2024 - 12/24/2024 | Mallard Pointe 1951 Project | Belevedere, Marin County |
12/5/2024 - 12/24/2024 | Emergency Winterization Work at 6361 SFD Blvd, San Geronimo | San Geronimo, Marin County |
12/10/2024 - 12/30/2024 | Interstate 80 (I-80) Westbound Cordelia Commercial Vehicle Enforcement Facility (CCVEF) Project (Project), Caltrans 0A53T | Unincorporated, Solano County |
12/10/2024 - 12/30/2024 | Ayala Cove Boat Dock Replacement | Angel Island, Marin County |
12/11/2024 - 12/31/2024 | Union Pacific Railroad’s Bahia Yard Expansion Project | Benicia, Solano County |
12/12/2024 - 1/1/2025 | Stagecoach North Waters Crossings | Unincorporated, Napa County |
12/12/2024 - 1/1/2025 | Patterson Slide Repair Phase 2, 752 St. Marys Rd | Lafayette, Contra Costa County |
12/17/2024 - 1/6/2025 | Slip-Out Repair And Bank Stabilization Near 1780 Higgins Canyon Road Project | Unincorporated, San Mateo County |
12/18/2024 - 1/7/2025 | Sir Francis Drake Blvd Emergency Culvert and Ditch Cleaning Inverness | Inverness, Marin County |
12/20/2024 - 1/9/2025 | Arroyo Mocho Levee Repair Project | Unincorporated, Alameda County |
12/20/2024 - 1/9/2025 | 35404769_NOVATO 1104_OH Pole & Anchor Replacement_River Vista | Novato, Marin County |
12/21/2024 - 1/10/2025 | Crown Beach Emergency Shoreline Protection | Alameda, Alameda County |
12/21/2024 - 1/10/2025 | Vallejo Marina A Dock Removal | Vallejo, Solano County |
The USACE and the San Francisco Bay Regional Water Quality Control Board (Regional Water Board) have prepared a Draft Environmental Assessment (EA)/ Environmental Impact Report (EIR) to address the potential environmental effects of the maintenance dredging of federal aquatic navigation channels in San Francisco Bay and the associated placement of dredged materials for dredging years 2025 to 2034. The USACE proposes to continue maintenance dredging of the federal navigation channels in San Francisco Bay to maintain the navigability of the channels. The Regional Water Board will consider USACE’s application for a Clean Water Act Section 401 water quality certification and waste discharge requirements for USACE’s continued maintenance dredging operations.
A comment period is established for this document, from October 31, 2024, to December 16, 2024. The Water Board will accept written comments on the Draft EA/EIR. Written comments must be received no later than 5:00 p.m. on December 16, 2024, to be considered. Please send all comments to:
Jazzy.Graham-Davis@waterboards.ca.gov and SF-Bay-Dredging@usace.army.mil or 1515 Clay Street, Suite 1400, Oakland, CA 94612, Attn.: Jazzy Graham-Davis.
A public meeting will be held to explain the proposed project and answer clarifying questions on the Draft EA/EIR. This meeting will be held online on November 19, 2024, from 4:00 to 6:00 p.m. Please register for this meeting at: https://stantec.zoom.us/meeting/register/tJ0sdOivpzoqG9B7k6nrmy6YTAyBo2VIchZr. The Regional Water Board anticipates a public hearing on the Final EIR in summer/fall 2025.
- Public notice of availability, notice of comment period, notice of public meeting
- Draft Environmental Assessment / Environmental Impact Report *Appendix A
*Appendix B
*Appendix C
*Appendix D
*Appendix E
*Appendix F
*Draft FONSI
Update 12/13/24
The draft EA/EIR comment period has been extended. Written comments must be received no later than 5:00 p.m. on December 30, 2024, to be considered.
Storm Water