Leviathan Mine Photographs
![](docs/pictures/levi_creek_1981.jpg)
Leviathan Creek cutting through earthen levy, October 1981
![](docs/pictures/pit_adit5_drainage_1978.jpg)
Pit and Adit #5 drainage, August 1978
![](docs/pictures/waste_pile_1982.jpg)
Waste Pile, looking southwest, November 198
![](docs/pictures/open_pit_1983.jpg)
View in open pit, facing southwest, October 1983
![](docs/pictures/biphasic_pond1_2000.jpg)
Looking at Biphasic Treatment System from above Pond 1, October 2000
![](docs/pictures/biphasic_pond1_2001.jpg)
Biphasic Treatment System at Pond 1, September 2001
![](docs/pictures/crusher_pond2s_2001.jpg)
Looking over the Crusher at Ponds 2S, 2N, and 3 at the end of the treatment season, September 2001
![](docs/pictures/pit_clarifier_2001.jpg)
Pit Clarifier Construction, early summer 2001
![](docs/pictures/pit_clarifier_in_action_2001.jpg)
Pit Clarifier in action, far corner is the outlet behind the silt screen, September 2001
![](docs/pictures/reveg_pond1_1999.jpg)
Revegetation above Pond 1, amended holes, July 1999
![](docs/pictures/looking_reveg_pond1_1999.jpg)
Looking at revegetation above Pond 1, amended holes, July 1999
![](docs/pictures/looking_reveg_pond1_2000.jpg)
Looking at revegetation above Pond 1 - 1 year after revegetation, July 2000
![](docs/pictures/reveg_pond2_1999.jpg)
Revegetation amendment at Pond 2 slope, July 1999
![](docs/pictures/pond2_slope_reveg_2000.jpg)
Pond 2 slope revegetation, (note the non-amended area to the right of PVC line on lower bench) October 2000
![](docs/pictures/closeup_reveg_pond2_2000.jpg)
Close-up of revegetation at Pond 2, (note the non-amended area to the right of PVC line on lower bench) October 2000