Leviathan Mine Photographs

Leviathan Creek cutting through earthen levy, October 1981
Leviathan Creek cutting through earthen levy, October 1981
Pit and Adit #5 drainage, August 1978
Pit and Adit #5 drainage, August 1978

 

Waste Pile, looking southwest, November 1982
Waste Pile, looking southwest, November 1982
View in open pit, facing southwest, October 1983
View in open pit, facing southwest, October 1983

 

Looking at Biphasic Treatment System from above Pond 1, October 2000
Looking at Biphasic Treatment System from above Pond 1, October 2000
Biphasic Treatment System at Pond 1, September 2001
Biphasic Treatment System at Pond 1, September 2001

 

Looking over the Crusher at Ponds 2S, 2N, and 3 at the end of the treatment season, September 2001
Looking over the Crusher at Ponds 2S, 2N, and 3 at the end of the treatment season, September 2001
Pit Clarifier Construction, early summer 2001
Pit Clarifier Construction, early summer 2001

 

Pit  Clarifier in action
Pit Clarifier in action, far corner is the outlet behind the silt screen, September 2001
Revegetation above Pond 1
Revegetation above Pond 1, amended holes, July 1999

 

revegetation above Pond 1
Looking at revegetation above Pond 1, amended holes, July 1999
 revegetation above Pond 1 - 1 year after 
    revegetation
Looking at revegetation above Pond 1 - 1 year after revegetation, July 2000

 

Revegetation 
    amendment at Pond 2
Revegetation amendment at Pond 2 slope, July 1999
Pond     2 slope revegetation
Pond 2 slope revegetation, (note the non-amended area to the right of PVC line on lower bench) October 2000

 

Close-up     of revegetation at Pond 2
Close-up of revegetation at Pond 2, (note the non-amended area to the right of PVC line on lower bench) October 2000