2028 California Integrated Report
For the 2028 California Integrated Report, data from waterbodies in the Central Coast, Central Valley Sacramento – San Joaquin River Delta and the Tulare Lake Basin, and San Diego Regional Quality Water Boards will be assessed as “on-cycle’ assessments.
Project Timeline
Spring 2027 | Spring 2027 | Spring 2027 | Winter 2027 | Winter 2027/2028 | Spring 2028 |
---|---|---|---|---|---|
Draft Staff Report release | Public Review and Comment Period | Hearing on the proposed statewide 303(d) List | Release of Revised Staff Report and Response to Comments | Adoption Meeting on proposed statewide 303(d) list | Submittal to U.S. EPA |
Notices
Solicited Data
- Data Assembled for Evaluation - List of parent projects categorized by region with data received through CEDEN, CIWQS, and WQX databases as well as submitted through the Integrated Report Document Upload Portal assembled for evaluation during the 2028 cycle.