Issue Date: November 22, 1995
Revision Date: April 28, 2005
OPW Fuel Management Systems
(originally listed as Emco Electronics, Tuthill Transfer Systems)
EECO System LLD (for Flexible Pipelines)
Automatic Electronic Line Leak Detector
Certification | Leak rate of 3.0 gph at 10 psi* with PD = 100% and PFA = 0%. Leak rate of 0.1 gph at 1.5 times operating pressure* with PD = 100% and PFA = 0%. *Since leak rate varies as a function of pressure, this leak rate and pressure were certified using an equivalent leak rate and pressure, in accordance with an acceptable protocol. |
---|---|
Leak Threshold | 2.0 gph for leak rate of 3.0 gph. 0.0793 gph for leak rate of 0.1 gph. A pipeline system should not be declared tight if the test result indicates a loss that equals or exceeds this threshold. |
Applicability | Gasoline, diesel, aviation fuel, fuel oil #4. |
Specification | System tests pressurized flexible pipelines. Tests are conducted at operating pressure. |
Pipeline Capacity | Maximum of 49.6 gallons. |
Waiting Time | None between delivery and testing. None between dispensing and testing for leak rate of 3.0 gph. Minimum of 14 minutes between dispensing and testing for leak rate of 0.1 gph. |
Test Period | Response time is 11 minutes, 24 seconds for leak rate of 3.0 gph. Minimum of 9 hours for leak rate of 0.1 gph. Test data are acquired and recorded by a microprocessor. Calculations are automatically performed by the microprocessor. |
System Features | Permanent installation on pipeline. Automatic testing of pipeline. Preset threshold. Single test to determine if pipeline is leaking. Pump shutdown, message display, and alarm activation if leak is declared. |
Calibration | Equipment must be checked annually for capability of detecting a line leak of 3.0 gph and, if necessary, calibrated in accordance with manufacturer's instructions. |
- OPW Fuel Management Systems
6900 Santa Fe Dr.
Hodgkins, IL 60525
Tel: (708) 485-4200
URL: www.opwglobal.com/opw-fms - Evaluator: Ken Wilcox Associates
Tel: (816) 443-2494
Date of Evaluation: 07/18/94
Home | Vendors: A–F | Vendors: G–M | Vendors: N–S | Vendors: T–Z | Method Index
Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. For full details, please refer to our expanded DISCLAIMER page.