Welcome to the State Water Resources Control Board Welcome to the California Environmental Protection Agency
Governor's Website Visit the Water Board Members Page
Agendas
My Water Quality
Performance Report
UST Program - LG 113

UST Programs - LG 113

Issue Date: May 2, 2000
Revision Date: May 15, 2008  

Tanknology - NDE
TLD-1 (for Flexible Pipelines)

LINE TIGHTNESS TEST METHOD

Certification Leak rate of 0.1 gph with PD = 99.7% and PFA = 0.3%.
Leak Threshold 0.05 gph. 
A pipeline system should not be declared tight if the test result indicates a loss that equals or exceeds this threshold.
Applicability Gasoline, diesel, aviation fuel.
Specification System tests flexible pipelines. 
Tests are conducted at 150% operating pressure. 
Mechanical line leak detector must be removed or isolated from pipeline for duration of test.
Pipeline Capacity Maximum of 119.4 gallons.
Waiting Time Testing may begin immediately after system is installed in the line.
Test Period Minimum of 30 minutes. Consistent readings for at least three readings must be obtained for a valid test. The actual test time will depend on line size and temperature conditions at the site. The data from this evaluation suggests that the actual minimum test time is 50 minutes for a line of this capacity.
Test may not be ended until pass/fail criteria set by manufacturer has been met. 
Pipe deflection, vapor pockets, and large temperature differences may produce inconsistent readings. 
Testing must continue until stable conditions are present. 
Test data are acquired and recorded manually.
Comments Enviroflex pipeline with a bulk modulus* of 8,359 was used during evaluation. 
*See glossary.

Tanknology - NDE
8900 Shoal Creek Blvd. , Building 200
Austin , TX 78757
Tel:  (800) 800-4633
Evaluator:  Ken Wilcox Associates
Tel:  (816) 443-2494
Dates of Evaluation:  04/30/94 , 07/22/07  


 | Home | Vendors: A - F | Vendors: G - M | Vendors: N - S | Vendors: T - Z | Method Index |


Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment.
Equipment should be installed and operated in accordance with all applicable laws and regulations.
For full details, please refer to our expanded "DISCLAIMER" page.

 
 

.