Welcome to the State Water Resources Control Board Welcome to the California Environmental Protection Agency
Governor's Website Visit the Water Board Members Page
Agendas
My Water Quality
Performance Report
UST Program - LG 113

UST Programs - LG 113

Veeder-Root

TLS 350, 350PC, 350R, 350RPC, 350Plus, 450, LLD-300,
Red Jacket ProMax Leak Detector, Series 8484
(for Flexible Pipelines)

AUTOMATIC ELECTRONIC LINE LEAK DETECTOR

Certification Leak rate of 3.0 gph at 10 psi* with PD = 100% and PFA = 0%.
Leak rate of 0.2 gph at operating pressure with PD = 100% and PFA = 0%.
Leak rate of 0.1 gph at 1.5 times operating pressure* with PD = 100% and PFA = 0%.
*Since leak rate varies as a function of pressure, this leak rate and pressure were certified using an equivalent leak rate and pressure, in accordance with an acceptable protocol.
Leak Threshold 1.5 gph for leak rate of 3.0 gph.
0.17 gph for leak rate of 0.2 gph.
0.05 gph for leak rate of 0.1 gph.
A pipeline system should not be declared tight if the test result indicates a loss that equals or exceeds this threshold.
Applicability

Gasoline, diesel, aviation fuel, ethanol blends up through E100, biodiesel blends B6-B20 meeting ASTM D7467, biodiesel B100 meeting ASTM D6751*.

Other liquids with known coefficients of expansion and density may be tested after consultation with the manufacturer.
*NWGLDE Listings apply to leak detection functionality only and not material compatibility - see "Disclaimer".

Evaluations determined that the Series 8484 PLLD responds to 100% Lubrizol Ultrazol 9888, 100% Afton OTR 8332G, and 100% Afton OTR 8843G. Alarm and response can be expected to be very similar to the response values listed above.

Specification System tests pressurized flexible pipelines.
Tests are conducted at operating pressure.
System will not function with a mechanical line leak detector installed in the pipeline.
Pipeline Capacity Maximum of 40.8 gallons.
Waiting Time None between delivery and testing.
Minimum of 13 minutes between dispensing and testing for leak rate of 3.0 gph.
Minimum of 4 minutes to 1 hour, 9 minutes between dispensing and testing for leak rate of 0.2 gph.
Minimum of 1 to 4 hours between dispensing and testing for leak rate of 0.1 gph.
Test Period Response time is 1 to 6 minutes for leak rate of 3.0 gph.
Response time is 40 minutes to 1 hour for leak rate of 0.2 gph.
Response time is 45 minutes to 1 hour, 15 minutes for leak rate of 0.1 gph.
Test data are acquired and recorded by a microprocessor.
Calculations are automatically performed by the microprocessor.
System Features TLS 350 console can only be used with Series 8484 PLLD.
TLS 450 console can only be used with Series 8590 DPLLD.
When using Red Jacket BIG-FLO Submersible Pump Models P100H1, P200H1, P200H3, P300H3, P500H3, the PLLD only performs 3.0 gph testing and not precision (0.2 and 0.1 gph) testing.
{USER DEFINED} pipe type must be selected under the PLLD setup to allow precision (0.2 and 0.1 gph) testing with Red Jacket BIG-FLO Submersible Pump Models: MAXXUM MXP300, MAXXUM MXP500.
Total vertical rise of pipeline must not exceed 11 feet above transducer.
Permanent installation on pipeline.
Automatic testing of pipeline.
Preset threshold.
Single test to determine if pipeline is leaking.
Pump shutdown (optional), message display and alarm activation if leak is declared.
Calibration Equipment must be checked annually for capability of detecting a line leak of 3.0 gph and, if necessary, calibrated in accordance with manufacturer's instructions.

Veeder-Root
125 Powder Forest Dr.
Simsbury, CT  06070-2003
Tel:  (860) 651-2700
E-mail: info@veeder.com
URL: www.veeder.com

Evaluator:  Midwest Research Institute
Tel:  (816) 753-7600
Date of Evaluation:  10/16/95, 01/31/97

Evaluator: Ken Wilcox Associates
Tel: (816) 443-2494
Dates of Evaluation: 2/27/2008, 7/28/09, 03/24/11(letter), 3/6/2013(letter), 4/4/2015 (letter)


 | Home | Vendors: A - F | Vendors: G - M | Vendors: N - S | Vendors: T - Z | Method Index |


Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment.
Equipment should be installed and operated in accordance with all applicable laws and regulations.
For full details, please refer to our expanded "DISCLAIMER" page.

 
 

.