- Executive Summary and Table of Contents
- Chapter 12 – Terrestrial Biological Resources
- Chapter 24 – Hazards and Hazardous Materials
- Chapter 1 – Introduction
- Chapter 13 – Land Use
- Chapter 25 – Public Health
- Chapter 2 – Proj. Objectives, Purpose & Need
- Chapter 14 – Agricultural Resources
- Chapter 26 – Mineral Resources
- Chapter 3 – Description of Alternatives
- Chapter 15 – Recreation
- Chapter 27 – Paleontological Resources
- Chapter 4 – Approach to Envir. Analysis
- Chapter 16 – Socioeconomics
- Chapter 28 – Environmental Justice
- Chapter 5 – Water Supply
- Chapter 17 – Aesthetics and Visual Resources
- Chapter 29 – Climate Change
- Chapter 6 – Surface Water
- Chapter 18 – Cultural Resources
- Chapter 30 – Growth Inducement
- Chapter 7 – Groundwater
- Chapter 19 – Transportation
- Chapter 31 – CEQA/NEPA Req. Sections
- Chapter 8 – Water Quality
- Chapter 20 – Public Services and Utilities
- Chapter 32 – Public Involvement
- Chapter 9 – Geology and Seismicity
- Chapter 21 – Energy
- Chapter 33 – List of Preparers Chapter 10 – Soils
- Chapter 22 – Air Quality & Greenhouse Gases
- Chapter 34 – References
- Chapter 11 – Fish and Aquatic Resources
- Chapter 23 – Noise
- Chapter 35 – Glossary
- Index
2013 Public Review Draft BDCP EIR/EIS
CALIFORNIA WATERFIX HEARING EXHIBIT NO. SWRCB-4
In accordance with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), on December 13, 2013 the California Department of Water Resources published a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the Bay-Delta Conservation Plan by posting it to the public web site for the BDCP, http://baydeltaconservationplan.com. The specific page URL for Draft EIR/EIS documents is http://baydeltaconservationplan.com/EnvironmentalReview/EnvironmentalReview/2013-2014PublicReview/2013PublicReviewDraftEIR-EIS.aspx. It is anticipated that the Draft EIR/EIS will be used by multiple parties, including the petitioners, as evidence in the hearing to consider conditional changes to the water right permits of the Department of Water Resources and the U.S. Bureau of Reclamation in support of the California WaterFix project. To discourage introducing the same document under different party/exhibit numbers, Board staff copied the Draft EIR/EIS to a web server under the control of the State Water Board's I.T. Division and labeled it as Exhibit No. SWRCB-4. Parties in the hearing who plan to use the Draft EIR/EIS in their testimony are requested to use this identification when introducing the document by reference. Other party exhibit identification numbers will not be allowed for the Draft EIR/EIS.
Draft EIR/EIS documents were downloaded on December 17, 2015 and are linked in the sections below. Document Chapters and files are preserved in the same order as the BDCP web site. Staff also copied the BDCP Draft EIR/EIS Errata Sheet dated 12/20/2013.
Executive Summary and Table of Contents
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Cover Title Sheet | 12/09/2013 | 0.30 MB |
Public Draft BDCP EIR-EIS Executive Summary | 12/09/2013 | 2.50 MB |
Public Draft BDCP EIR-EIS Executive Summary - Figures | 12/09/2013 | 6.41 MB |
Public Draft BDCP EIR-EIS Table of Contents and Acronyms | 12/09/2013 | 1.70 MB |
Chapter 1 - Introduction
Provides background, including information on the BDCP's relationship to the Delta Reform Act and Delta Plan, project area description, intended uses of the EIR/EIS, and agency roles and responsibilities. Also includes an overview of the project approval process, use of the EIR/EIS by other entities, and issues of known controversy.
Chapter 2 - Project Objectives and Purpose and Need
Describes the project objectives, purpose, and need within the context of the Delta's history, California water use, the regulatory environment, and ecological conditions.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 2 - Project Objectives and Purpose and Need | 12/09/2013 | 0.47 MB |
Chapter 3 - Description of Alternatives
Describes the alternatives being considered to meet the project objectives described in Chapter 1.
Chapter 4 - Approach to Environmental Analysis
Provides a framework for the environmental consequences analyses, including any relevant evaluation timeframes, and an overview of the project-level and program-level analysis elements. Also describes the overall organization and content of the resource-specific analyses (Chapters 5–30) and the CEQA determinations (Chapter 31); and an overview of modeling tools and applications.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 4 - Approach to the Environmental Analysis | 12/09/2013 | 0.71 MB |
Public Draft BDCP EIR-EIS Chapter 4 - Figures | 12/09/2013 | 0.13 MB |
Public Draft BDCP EIR-EIS Appendix 4A - Summary of Survey Data Collection Efforts by DWR to Obtain Information Regarding Baseline Conditions in Areas That Could Be Affected by BDCP | 12/09/2013 | 0.24 MB |
Chapter 5 - Water Supply
Provides a description of the environmental setting/affected environment related to water supply that may be influenced by implementation of the BDCP alternatives, including possible changes to water supply conditions.
Chapter 6 - Surface Water
Describes the potential changes to surface waters (North Coast, Sacramento River and San Joaquin River basins, including the Delta and Suisun Marsh located at the confluence of the Sacramento and San Joaquin rivers) due to modifications in SWP and CVP water supply operations and implementation of habitat restoration in the Delta and Suisun Marsh identified in the BDCP alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 6 - Surface Water | 12/09/2013 | 1.90 MB |
Public Draft BDCP EIR-EIS Chapter 6 - Figures | 12/09/2013 | 30.04 MB |
Chapter 7 - Groundwater
Describes the potential changes to groundwater due to implementation of the BDCP alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 7 - Groundwater | 12/09/2013 | 1.14 MB |
Public Draft BDCP EIR-EIS Chapter 7 - Figures | 12/09/2013 | 21.04 MB |
Public Draft BDCP EIR-EIS Appendix 7A - Groundwater Model Documentation | 12/09/2013 | 0.77 MB |
Public Draft BDCP EIR-EIS Appendix 7A - Figures | 12/09/2013 | 23.17 MB |
Chapter 8 - Water Quality
Defines the environmental setting/affected environment for surface water quality, reviews the environmental and regulatory setting with respect to water quality, and provides an assessment of existing water quality conditions within the project area.
Chapter 9 - Geology and Seismicity
Describes the existing geologic and seismologic conditions and the associated potential geologic, seismic, and geotechnical hazards in the Delta and Suisun Marsh area.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 9 - Geology and Seismicity | 12/09/2013 | 2.78 MB |
Public Draft BDCP EIR-EIS Chapter 9 - Figures | 12/09/2013 | 12.79 MB |
Chapter 10 - Soils
Provides information on soils in the Plan Area which includes portions of the Delta, Suisun Marsh, and Yolo Bypass.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 10 - Soils | 12/09/2013 | 1.90 MB |
Public Draft BDCP EIR-EIS Chapter 10 - Figures | 12/09/2013 | 35.18 MB |
Public Draft BDCP EIR-EIS Appendices 10A 10B and 10C | 12/09/2013 | 1.32 MB |
Chapter 11 - Fish and Aquatic Resources
Describes the area of potential environmental effects relative to fish and aquatic resources as they may be impacted by the BDCP alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 11 - Fish and Aquatic Resources - Part 1 | 12/09/2013 | 14.70 MB |
Public Draft BDCP EIR-EIS Chapter 11 - Fish and Aquatic Resources - Part 2 | 12/09/2013 | 10.87 MB |
Public Draft BDCP EIR-EIS Chapter 11 - Figures | 12/09/2013 | 9.98 MB |
Public Draft BDCP EIR-EIS Appendix 11A - Covered Fish Species Descriptions | 12/09/2013 | 1.98 MB |
Public Draft BDCP EIR-EIS Appendix 11B - Noncovered Fish and Aquatic Species Descriptions | 12/09/2013 | 0.51 MB |
Public Draft BDCP EIR-EIS Appendix 11C - CALSIM II Model Results Utilized in the Fish Analysis | 12/09/2013 | 12.51 MB |
Public Draft BDCP EIR-EIS Appendix 11D - Sacramento River Water Quality Model and Reclamation Temperature Model Results Utilized in the Fish Analysis | 12/09/2013 | 11.07 MB |
Chapter 12 - Terrestrial Biological Resources
Describes the environmental setting/affected environment for the terrestrial biological resources present in the BDCP Plan Area.
Chapter 13 - Land Use
Describes existing land uses and planned future land uses that could be affected by construction and operation of the alternatives. Summarizes goals, objectives, and policies from the general plans and other regulations of entities with jurisdiction in the Delta, Suisun Marsh, and Yolo Bypass upstream of the statutory Delta.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 13 - Land Use | 12/09/2013 | 3.06 MB |
Public Draft BDCP EIR-EIS Chapter 13 - Figures | 12/09/2013 | 8.49 MB |
Public Draft BDCP EIR-EIS Chapter 13 - Mapbook Figures | 12/09/2013 | 18.67 MB |
Chapter 14 - Agricultural Resources
Describes the agricultural resources within the study area, specifically the Delta Region, along with areas in Suisun Marsh and the Yolo Bypass covered by Restoration Opportunity Areas (ROAs) identified in the BDCP. Specific impacts to agriculture may also be discussed in Chapters 5, 16, and 30 of the EIR/EIS.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 14 - Agricultural Resources | 12/09/2013 | 1.80 MB |
Public Draft BDCP EIR-EIS Chapter 14 - Figures | 12/09/2013 | 12.42 MB |
Public Draft BDCP EIR-EIS Chapter 14 - Mapbook Figures | 12/09/2013 | 23.51 MB |
Public Draft BDCP EIR-EIS Appendix 14A - Individual Crop Effects as a Result of BDCP Water Conveyance Facility Construction | 12/09/2013 | 0.24 MB |
Public Draft BDCP EIR-EIS Appendix 14B - Delta Agricultural Stewardship Strategies | 12/09/2013 | 0.30 MB |
Chapter 15 - Recreation
Describes the recreation facilities and associated recreation activities and opportunities that could be affected by implementing the alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 15 - Recreation | 12/09/2013 | 3.96 MB |
Public Draft BDCP EIR-EIS Chapter 15 - Figures | 12/09/2013 | 7.28 MB |
Public Draft BDCP EIR-EIS Chapter 15 - Mapbook Figures | 12/09/2013 | 18.80 MB |
Public Draft BDCP EIR-EIS Appendix 15A - Privately Owned Recreation Facilities by County | 12/09/2013 | 0.22 MB |
Public Draft BDCP EIR-EIS Appendix 15B - Recreation Setting and California State Park Recommendations by County | 12/09/2013 | 0.19 MB |
Public Draft BDCP EIR-EIS Appendix 15C - Additional Recreation Figures | 12/09/2013 | 9.79 MB |
Chapter 16 - Socioeconomics
Describes the socioeconomic conditions for the Delta including both quantitative and qualitative measures, and focuses on community character, social and economic characteristics, population, housing, employment, and income at regional levels.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 16 - Socioeconomics | 12/09/2013 | 2.72 MB |
Public Draft BDCP EIR-EIS Chapter 16 - Figures | 12/09/2013 | 0.16 MB |
Public Draft BDCP EIR-EIS Appendix 16A - Regional Economic Impacts of Water Conveyance Facility Construction | 12/09/2013 | 0.40 MB |
Public Draft BDCP EIR-EIS Appendix 16B - Community Characterization Photographs | 12/09/2013 | 1.16 MB |
Chapter 17 - Aesthetics and Visual Resources
Identifies the study area visual resources that could be affected by implementing the alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 17 - Aesthetics and Visual Resources | 12/09/2013 | 2.55 MB |
Public Draft BDCP EIR-EIS Chapter 17 - Figures | 12/09/2013 | 25.67 MB |
Public Draft BDCP EIR-EIS Appendix 17A - Candidate KOP Sensitivity Rating Scales | 12/09/2013 | 0.61 MB |
Public Draft BDCP EIR-EIS Appendix 17B - Photo Simulation Data Sources and Assumptions | 12/09/2013 | 0.12 MB |
Public Draft BDCP EIR-EIS Appendix 17C - Scenic Quality Rating Summaries | 12/09/2013 | 0.16 MB |
Public Draft BDCP EIR-EIS Appendix 17D - Permanent Impacts after Construction is Complete | 12/09/2013 | 0.62 MB |
Public Draft BDCP EIR-EIS Appendix 17D - Figures | 12/09/2013 | 10.86 MB |
Public Draft BDCP EIR-EIS Appendix 17E - Permanent Features | 12/09/2013 | 0.56 MB |
Chapter 18 - Cultural Resources
Provides an overview of the methods used to identify the kind and density of cultural resources in the Plan Area.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 18 - Cultural Resources | 12/09/2013 | 2.11 MB |
Public Draft BDCP EIR-EIS Appendix 18A - Cultural Resources Supporting Information | 12/09/2013 | 0.76 MB |
Public Draft BDCP EIR-EIS Appendix 18A - Figures | 12/09/2013 | 4.06 MB |
Public Draft BDCP EIR-EIS Appendix 18B - Identified Resources Potentially Affected by the BDCP Alternatives | 12/09/2013 | 1.14 MB |
Chapter 19 - Transportation
Describes the transportation facilities that could be affected by implementing the alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 19 - Transportation | 12/09/2013 | 3.17 MB |
Public Draft BDCP EIR-EIS Chapter 19 - Figures | 12/09/2013 | 21.65 MB |
Public Draft BDCP EIR-EIS Appendix 19A - Construction Traffic Impact Analysis | 12/09/2013 | 1.56 MB |
Public Draft BDCP EIR-EIS Appendix 19A - Attachments A-E | 12/09/2013 | 3.48 MB |
Chapter 20 - Public Services and Utilities
Describes public services and utilities in the Plan Area that could be affected by construction and operation of the action alternatives in the Delta, the Suisun Marsh, and portions of the Yolo Bypass. Public services include law enforcement, fire protection and emergency response, hospitals and medical services facilities, public schools, and libraries. Utilities include solid waste management, water supply and treatment, wastewater treatment, energy, and communications.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 20 - Public Services and Utilities | 12/09/2013 | 1.88 MB |
Public Draft BDCP EIR-EIS Chapter 20 - Figures | 12/09/2013 | 20.47 MB |
Public Draft BDCP EIR-EIS Appendix 20A - Details of Public Services and Utilities Supporting the Plan Area | 12/09/2013 | 1.05 MB |
Chapter 21 - Energy
Discusses the existing conditions for energy generation at the SWP and CVP hydropower facilities and the existing energy use for pumping existing water supplies into the various canals and tunnels in the existing water conveyance and distribution systems.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 21 - Energy | 12/09/2013 | 1.66 MB |
Public Draft BDCP EIR-EIS Chapter 21 - Figures | 12/09/2013 | 0.59 MB |
Chapter 22 - Air Quality and Greenhouse Gases
Describes existing conditions related to air quality in the air quality study area. It also discusses federal, state, and local regulations related to air quality that would apply to the alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 22 - Air Quality and Greenhouse Gases | 12/09/2013 | 4.27 MB |
Public Draft BDCP EIR-EIS Chapter 22 - Figures | 12/09/2013 | 5.42 MB |
Public Draft BDCP EIR-EIS Appendix 22A - Air Quality Analysis Assumptions | 12/09/2013 | 0.79 MB |
Public Draft BDCP EIR-EIS Appendix 22B - Air Quality Assumptions | 12/09/2013 | 7.40 MB |
Public Draft BDCP EIR-EIS Appendix 22C - Health Risk Assessment | 12/09/2013 | 14.56 MB |
Public Draft BDCP EIR-EIS Appendix 22D - DWR Climate Action Plan | 12/09/2013 | 1.51 MB |
Public Draft BDCP EIR-EIS Appendix 22E - Conformity Letters | 12/09/2013 | 0.27 MB |
Chapter 23 - Noise
Describes the existing noise environment in the noise study area, and identifies receptors that may potentially be affected by noise. It evaluates noise-sensitive receptors associated with residential and recreational land uses in the Delta and the potential effects of Conservation Measure 1 on these receptors.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 23 - Noise | 12/09/2013 | 2.09 MB |
Public Draft BDCP EIR-EIS Chapter 23 - Figures | 12/09/2013 | 0.20 MB |
Chapter 24 - Hazards and Hazardous Materials
Discusses existing study area characteristics as they pertain to hazards and hazardous materials, federal, state and local regulations applicable to the use, storage and disposal of hazardous materials, the potential effects on the public and the environment from hazards and hazardous materials associated with implementation of the proposed alternatives, as well as potential mitigation measures to reduce the severity of these effects.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 24 - Hazards and Hazardous Materials | 12/09/2013 | 2.39 MB |
Public Draft BDCP EIR-EIS Chapter 24 - Figures | 12/09/2013 | 36.39 MB |
Public Draft BDCP EIR-EIS Appendix 24A - Draft Phase 1 Initial Site Assessment | 12/09/2013 | 17.36 MB |
Chapter 25 - Public Health
Focuses on issues related to human health and safety that could potentially be affected by the implementation of the BDCP alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 25 - Public Health | 12/09/2013 | 2.25 MB |
Public Draft BDCP EIR-EIS Chapter 25 - Figures | 12/09/2013 | 6.50 MB |
Chapter 26 - Mineral Resources
Describes existing mineral resources within the mineral resources study area that could be affected by construction and operation of the BDCP alternatives.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 26 - Mineral Resources | 12/09/2013 | 1.67 MB |
Public Draft BDCP EIR-EIS Chapter 26 - Figures | 12/09/2013 | 7.45 MB |
Public Draft BDCP EIR-EIS Appendix 26A - Natural Gas Wells | 12/09/2013 | 0.62 MB |
Chapter 27 - Paleontological Resources
Addresses paleontological resources and the potential effects of the BDCP alternatives on paleontological resources in the Delta and Suisun Marsh.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 27 - Paleontological Resources | 12/09/2013 | 1.38 MB |
Public Draft BDCP EIR-EIS Chapter 27 - Figures | 12/09/2013 | 8.30 MB |
Chapter 28 - Environmental Justice
Analyzes the potential for the BDCP alternatives to cause disproportionately high and adverse human health or environmental effects on minority and low‐income populations.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 28 - Environmental Justice | 12/09/2013 | 1.04 MB |
Public Draft BDCP EIR-EIS Chapter 28 - Figures | 12/09/2013 | 7.23 MB |
Public Draft BDCP EIR-EIS Appendix 28A - Census Data | 12/09/2013 | 0.84 MB |
Chapter 29 - Climate Change
Presents a discussion of the scientific fundamentals pertaining to climate change that relate to the study area; key regulatory documents associated with adaptation; linkages between resource areas addressed in this EIR/EIS and climate change; and an evaluation of the resiliency of each resource area under each project alternative to potential changes in climate.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 29 - Climate Change | 12/09/2013 | 0.87 MB |
Public Draft BDCP EIR-EIS Chapter 29 - Figures | 12/09/2013 | 4.26 MB |
Public Draft BDCP EIR-EIS Appendix 29A - Effects of Sea-Level Rise on Delta Tidal Flows and Salinity | 12/09/2013 | 0.53 MB |
Public Draft BDCP EIR-EIS Appendix 29A - Figures | 12/09/2013 | 1.03 MB |
Public Draft BDCP EIR-EIS Appendix 29B - Climate Change Effects on Hydrology in the Study Area Used for CALSIM Modeling Analysis | 12/09/2013 | 0.81 MB |
Public Draft BDCP EIR-EIS Appendix 29B - Figures | 12/09/2013 | 1.69 MB |
Public Draft BDCP EIR-EIS Appendix 29C - Climate Change and the Effects of Reservoir Operations on Water Temperatures in the Study Area | 12/09/2013 | 0.55 MB |
Public Draft BDCP EIR-EIS Appendix 29C - Figures | 12/09/2013 | 10.82 MB |
Chapter 30 - Growth Inducement
Addresses the direct and indirect growth inducement potential of the BDCP alternatives. Assessing growth inducement potential involves determining whether project implementation would directly or indirectly support economic expansion, population growth, or residential construction, and, if so, determining the magnitude and nature, and potential environmental effects of that growth.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 30 - Growth Inducement and Other Indirect Effects | 12/09/2013 | 1.87 MB |
Public Draft BDCP EIR-EIS Chapter 30 - Figures | 12/09/2013 | 1.08 MB |
Public Draft BDCP EIR-EIS Appendix 30A - Population Density in Hydrologic Regions | 12/09/2013 | 29.16 MB |
Public Draft BDCP EIR-EIS Appendix 30B - Water Contractor Profiles | 12/09/2013 | 0.95 MB |
Public Draft BDCP EIR-EIS Appendix 30B - Figures | 12/09/2013 | 5.29 MB |
Public Draft BDCP EIR-EIS Appendix 30C - Summary of Significant Impacts | 12/09/2013 | 1.84 MB |
Chapter 31 - Other CEQA/NEPA Required Sections
Provides an overview of other CEQA and NEPA considerations based on the technical analyses presented in Chapters 5–30, and addresses significant irreversible and irretrievable changes, and short-term uses versus long‐term productivity, selection of the environmentally superior/preferable alternative, and significant and unavoidable impacts.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 31 - Other CEQA/NEPA Required Sections | 12/09/2013 | 0.88 MB |
Public Draft BDCP EIR-EIS Appendix 31A - BDCP Later CM Activity Environmental Checklist | 12/09/2013 | 0.98 MB |
Chapter 32 - Public Involvement, Consultation, and Coordination
Provides a summary of the public involvement and outreach activities (including outreach to the federal and state agencies participating in the CEQA and NEPA processes) conducted for the BDCP EIR/EIS.
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 32 - Public Involvement - Consultation - and Coordination | 12/09/2013 | 0.28 MB |
Public Draft BDCP EIR-EIS Appendix 32A - Public Involvement Informational Materials | 12/09/2013 | 24.39 MB |
Chapter 33 - List of Preparers
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 33 - List of Preparers | 12/09/2013 | 0.42 MB |
Chapter 34 - References
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 34 - References Cited | 12/09/2013 | 1.58 MB |
Chapter 35 - Glossary
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Chapter 35 - Glossary | 12/09/2013 | 0.44 MB |
Index
Document Name | Date | Size |
---|---|---|
Public Draft BDCP EIR-EIS Index | 12/09/2013 | 1.60 MB |
- Errata to the Draft EIR/EIS