Federal Energy Regulatory Commission (FERC) Project No. 2105
Project Name: Upper North Fork Feather River Hydroelectric Project
Prattville Intakes on Lake Almanor
Photo provided by State Water Board staff
Applicant: Pacific Gas and Electric Company, Inc. (PG&E)
County: Plumas
License Expiration Date: October 31, 2004
Water Quality Certification Status: Issued July 15, 2020
Waterbody: North Fork Feather River
FERC Licensing Process: Traditional Licensing Process
Project Description
The Upper North Fork Feather River Hydroelectric Project (UNFFR Project) is located on the North Fork Feather River in Plumas County. It consists of three reservoirs with dams: Lake Almanor, Butt Valley reservoir and Belden forebay; five powerhouses; tunnels and penstocks connecting the reservoirs to the powerhouses; and transmission, operation and maintenance, and access facilities. The five powerhouses include eight hydroelectric generating units with a total nameplate capacity of 362.3 megawatts (MW).
Lake Almanor is the upstream-most reservoir on the North Fork Feather River within the UNFFR Project boundary and has the largest usable storage capacity (1,134,016 acre-feet). Lake Almanor is impounded by Canyon dam, an earth-filled structure that is 135 feet high by 1,400 feet wide at its base and 1,250 feet wide at its crest. Canyon dam has an outlet tower with multiple outlets that deliver water to a tunnel capable of releasing up to 2,100 cubic feet per second (cfs) to the North Fork Feather River (Seneca reach). Water is also diverted from Lake Almanor through the Prattville intake, which conveys flow through the 10,899-foot-long Prattville tunnel No. 1A and the 5,568-foot-long Butt Valley penstock to the Butt Valley powerhouse.
Butt Valley reservoir is south of Lake Almanor on Butt Creek, a tributary to the North Fork Feather River. In addition to inflow from the Butt Creek, Butt Valley reservoir receives flow from Lake Almanor through the Butt Valley powerhouse or, in some circumstances, via the bypass valve at the downstream portal of the Prattville tunnel, upstream of Butt Valley powerhouse. Butt Valley reservoir is impounded by Butt Valley dam, an earth-filled structure that is 1,350 feet long by 74 feet high, and 850 feet wide at its base. Butt Valley reservoir has a usable storage capacity of 49,897 acre-feet. Water is diverted from Butt Valley reservoir via the Caribou No. 1 and No. 2 intakes. Flow through the 9,776-foot-long Tunnel No. 2 travels to the 2,222-foot-long Caribou No. 1 penstock to the Caribou No. 1 powerhouse. Flow through the 8,710-foot-long Tunnel No. 2A travels to the 2,322-foot-long Caribou No. 2 penstock to the Caribou No. 2 powerhouse.
Belden forebay is located on the North Fork Feather River downstream of Lake Almanor and below Butt Valley reservoir. In addition to flow from the Seneca reach of the river, Belden forebay receives flow from the Caribou Nos. 1 and No. 2 powerhouses. Belden forebay is impounded by Belden forebay dam, a rock-filled structure that is 500 feet long, 152 feet high, and 630 feet wide. Belden forebay has a usable storage capacity of 2,421 acre-feet. Water is released from Belden forebay into the North Fork Feather River via the Oak Flat powerhouse or is diverted to the Belden powerhouse via the Belden intake and the Belden tunnel and penstock.
In addition to power generation, the UNFFR Project provides a range of recreational facilities, including campgrounds, marinas, and day-use areas. Lake Almanor and Butt Valley Reservoirs provide a variety of recreational opportunities, including contact and non-contact water-based recreation.
Related Documents
- Water Quality Certification for the Canyon Dam Low-level Outlet Install Cutoff Wall Project - Issued March 4, 2021
- Final Water Quality Certification for the Upper North Fork Feather River Hydroelectric Project - Issued July 15, 2020
- Notice of Availability for Public Comment on Revised Draft Environmental Impact Report and Draft Water Quality Certification - May 15, 2020
- Draft Water Quality Certification - May 15, 2020
- California Environmental Quality Act (CEQA) Process
- Revised Draft Environmental Impact Report (RDEIR) - May 15, 2020
- Appendix A: 2004 Settlement Agreement
- Appendix B: Scoping and Public Involvement
- Appendix C: Recreation Improvements
- Appendix D: Level 1 and Level 2 Report
- Appendix E: Level 3 Report
- Appendix E1: Summary of Supplemental Modeling Results
- Appendix E2: Documentation of Analysis of Stand-Alone Increased Canyon Dam Release Scenarios
- Appendix E3: Findings of Supplemental Modeling Results
- Appendix F: Evaluation of the Biological Performance of Potential Water Quality Measures
- Appendix G: Terrestrial Biology Lists
- Appendix H: PG&E Proposed Supplemental Construction Mitigation Measures - March 3, 2014
- Appendix I: Visual Assessment Units and Photographs
- Appendix J: Greenhouse Gas Emission Changes from Proposed Operation Measures
- Appendix J1: Supplemental Greenhouse Gas Emissions
- Revised Draft Environmental Impact Report (RDEIR) - May 15, 2020
- 2014 CEQA Process
- Comments Received on Draft Environmental Impact Report and Proposed Staff Recommendation
- Notice of Public Meeting to Accept Comments on the Draft Environmental Impact Report -
February 11, 2015 at 6:00 p.m. – Agenda
Veterans Memorial Hall
225 Gay Street
Chester, CA 96020
- PowerPoint Presentation: Color (full screen) or Black & White (handout)
- Meeting Transcript - February 11, 2015
- Notice of Availability - November 26, 2014; Interested Parties
- Draft Environmental Impact Report (EIR) - November 26, 2014
- Notice of Completion - November 26, 2014
- Development of Alternatives
- Scoping
- CEQA Scoping Report - 2006
- Comments on Notice of Preparation
- Scoping Meeting Transcript - September 27, 2005
- Project 2105 - CEQA NOP+Checklist - 2005
- Federal Energy Regulatory Commission (FERC)
- FERC’s Final Environmental Impact Statement - November 2005
- Other Related Documents
- Plumas County Board of Supervisors letter to State Water Resources Control Board regarding pending release of Draft Environmental Impact Report - August 13, 2013
- SWRCB response letter to Plumas County Board of Supervisors - September 13, 2013
- Upper North Fork Feather River Project Final Relicensing Settlement Agreement - April 22, 2004
- Plumas County Board of Supervisors letter to State Water Resources Control Board regarding pending release of Draft Environmental Impact Report - August 13, 2013