Underground Storage Tank (UST) Program

ENHANCED VAPOR RECOVERY SYSTEMS - DETERMINATION LETTERS

A provision of Assembly Bill (AB) 2955 (Statutes 2004, Chapter 649) requires the Air Resources Board (ARB) and State Water Resources Control Board (State Water Board) to determine collaboratively, to the best of their knowledge and using existing resources, that the equipment that meets the ARB’s Enhanced Vapor Recovery (EVR) requirements also meets underground storage tank (UST) statutory requirements. [Health and Safety Code (HSC), chapter 6.7, section 25290.1.2(a).] Below is a list of systems that have gone through the Multi Agency Review Process. The State Water Board found no evidence that these systems conflict with H&SC Chapter 6.7 section 25290.1.2(a).



Phase I Enhanced Vapor Recovery (EVR) Systems

Executive Order

Title of EVR System

Current EVR Determination Letter

Previously Issued EVR Determination Letters

VR-101 Phil-Tite Phase I EVR System Compilation of all previously issued EVR determination letters for Phil‑Tite and EBW phase I EVR systems and the addition of the Defender Series overfill prevention valve (3/21/2016)

Modification to the Frank Fueling Systems Defender Overfill Prevention Valve (2/25/2020)

Modification to the Franklin Fueling Systems Defender 804 Vent Cap (12/17/2019)

Addition of Defender Series spill containment to the Phil-Tite and EBW EVR phase I systems (5/13/2013)

Addition of E-85 fuel compatibility to the Phil-Tite EVR phase I system (6/26/2008)

Addition of the Husky Corp. Model 5885 Pressure/Vacuum vent valve (1/28/2008)

Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)

Addition of the EBW Auto Limiter II overfill prevention valve drop tube and other EBW EVR components to the Phil-Tite EVR phase I system (11/13/2006)

Addition of 85000-1 Series spill container to the Phil-Tite EVR phase I system (6/30/2005)

VR-102 OPW Phase I EVR System OPW Phase I EVR System Compilation of all previously issued EVR determination letters for the OPW Fueling Containment Systems Phase I EVR System and the addition of the Defender Series and EBW fill components (7/18/2019)

OPW Phase I EVR Addition of the Fibrelite Multiport Configuration and revisions of the equipment list (5/10/2016)

The addition of the OPW 1-2200 series spill containment and factory/field installed drain plug for the fill side of 1 series spill containment (8/26/2014)

Addition of the OPW 61JSK alternate remote fill configuration (9/6/2013)

Addition of the OPW 1-3700 Series spill container to retrofit existing 500L and 700L Series spill containers (4/16/2013)

Addition of the OPW 71SO-4XXCT Series overfill prevention valve (4/16/2013)

Addition of the OPW 1-3100 Series spill container (1/5/2009)

Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)

Addition of the OPW 71SO overfill prevention valve, the OPW 61JSK-4RMT remote fill configuration, and minor modifications of several existing components (4/10/2007)

Modifications to the OPW 1-2100 Series and Pomeco 500 Series spill containers and OPW 53 VML overfill prevention valve (8/31/2005)

VR-103 EBW Phase I EVR System See State Water Resources Control Board’s Determination Letter for VR-101
VR-104 CNI Manufacturing Phase I EVR System See Previously Issued EVR Determination Letters

Addition of the Husky Corp. Model 5885 Pressure/Vacuum vent valve (1/28/2008)

Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)

Addition of the Emco Wheaton Retail overfill prevention valve and swivel adaptor (8/10/2007)

Addition of the CNI Manufacturing 205 and 215 Models Stand-Alone/Direct Bury configuration spill container (9/14/2005)

VR-105 Emco Wheaton Retail Phase I EVR System Compilation of all previously issued EVR determination letters for the Emco Wheaton Retail Phase I EVR System (7/16/2014)

Addition of the Remote Fill and Auxiliary Tank Gauge Stick Port (3/30/2023)

Addition of the A1005 Aboveground Spill Container (3/30/3023)

Modification to the EMCO Model A1004EVR Series spill containment (3/27/2014)

Addition of the Emco Wheaton Retail A0020EVR Series drop tube and modifications to the A1004EVR Series spill container (11/17/2010)

Addition of the Husky Corp. Model 5885 Pressure/Vacuum vent valve (1/28/2008)

Addition of the Beaudreau Electric Inc. BEI PV-Zero vent valve (1/28/2008)

Addition of the Emco Wheaton Retail EVR phase I system (8/8/2006)

Phase II Enhanced Vapor Recovery Systems

Executive Order

Title of EVR System

Current EVR Determination Letter

Previously Issued EVR Determination Letters

VR-201 Assist Phase II EVR System See Previously Issued EVR Determination Letters

Modification to the Assist Enhanced Vapor Recovery Phase II System (10/1/2019)

Addition of Healy Liquid/Vapor Condensate Trap (11/18/2009)

Addition of Model 807 Swivel Breakaway and 1302 Flow Limiter to the Healy Phase II EVR System (11/13/2006)

Addition of the Healy Clean Air Separator, Model 9961 (4/7/2005)

VR-202 Assist Phase II EVR System Including ISD System See Previously Issued EVR Determination Letters

Veeder-Root TLS-450 Plus Monitroing Panel with ISD in Combination with the Permeator AT-150 Processor (10/2/2024)

Addition of the Veeder-Root TLS-450 Plus Monitoring Panel with ISD (5/30/2023)

Addition of the Permeator AT-150 Processor (10/1/2019)

Addition of the Healy Liquid/Vapor Condensate Trap (11/18/2009)

Modification to the Veeder-Root ISD system (3/26/2008)

Addition of the Incon In-Station Diagnostic (ISD) System (12/20/2007)

Addition of the Model 807 Swivel Breakaway and 1302 Flow Limiter to the Healy Phase II EVR System (11/13/2006)

Addition of the Veeder-Root ISD System (8/26/2005)

Addition of the Healy Clean Air Separator, Model 9961 (4/7/2005)

Franklin Fueling Systems Data Transfer Unit (TD-DTU) DTU Dispenser Installation Kit (7/17/2008)

VR-203 Balance Phase II EVR System See Previously Issued EVR Determination Letters

Addition of a Liquid Condensate Trap (3/25/2011)

Addition of VST Green Machine (1/10/2012)

Addition of the Healy Clean Air Separator (10/23/2009)

Addition of the VST ECS Membrane Processor (11/1/2007)

Addition of the Veeder-Root Vapor Polisher (10/3/2008)

Addition of the Hirt VCS-100 Vapor Processor (1/5/2009)

VR-204 Balance Phase II EVR System Including ISD System See Previously Issued EVR Determination Letters

Addition of the Veeder-Root TLS-450 Plus Monitoring Panel with ISD (5/30/2023)

Addition of a Liquid Condensate Trap (3/25/2011)

Addition of VST Green Machine (1/10/2012)

Addition of the Veeder-Root Vapor Polisher (10/3/2008)

Addition Veeder-Root ISD System (3/26/2008)

Addition of the Incon In-Station Diagnostic (ISD) System (12/20/2007)

Addition of the Hirt VCS-100 vapor processor and Franklin Fueling Systems VRM and DTU (6/17/2009)

Addition of the Hirt VCS-100 vapor processor (1/5/2009)

VR-205 VST Phase II EVR System with HIRT VCS 100 Thermal Oxidizer See State Water Resources Control Board’s Determination Letters for VR-203
VR-207 EMCO Wheaton Retail Phase II EVR System with HIRT VCS 100 Thermal Oxidizer See State Water Resources Control Board’s Determination Letters for VR-203
VR-208 EMCO Wheaton Retail Phase II EVR System with HIRT VCS 100 Thermal Oxidizer Including ISD System See State Water Resources Control Board’s Determination Letters for VR-204
VR-209 VST Phase II EVR System with FFS Clean Air Separator See State Water Resources Control Board’s Determination Letters for VR-203

Historical Enhanced Vapor Recovery Determination Letters

Manufacturer Model Applicability Description of Operation Date of Letter
OPW Fueling Components, Inc. Vaporsaver ORVR-Compatible Modification to EVR, Phase II System Change of fan material from plastic to aluminum, addition of a fan support bracket, and the use of cast aluminum for select components in place of machined aluminum. (E.O G-70-204.) 11/3/2005

 »» For more information regarding UST vapor recovery program, visit the Air Resources Board's Vapor Recovery Website.