2016 Final BDCP/California WaterFix EIR/EIS - Volume I

CALIFORNIA WATERFIX HEARING EXHIBIT NO. SWRCB-102

The Final EIR/EIS Volume I describes the alternatives, discusses potential environmental impacts, and identifies mitigation measures that would help avoid or minimize impacts. It combines the information contained in the Draft EIR/EIS with that of the RDEIR/SDEIS, and has adopted the organizational structure of the Draft EIR/EIS with the main body of the document organized as Chapters 1 through 35, along with supporting appendices. Return to the navigation to review Final EIR/EIS Volume II and supporting information.

It is anticipated that the Final EIR/FEIS will be used by multiple parties, including the petitioners, as evidence in the hearing to consider conditional changes to the water right permits of the Department of Water Resources and the U.S. Bureau of Reclamation in support of the California WaterFix project. To discourage introducing the same document(s) under different party/exhibit numbers, Board staff copied the Final EIR/EIS documents to a web server under the control of the State Water Board's I.T. Division and labeled it as Exhibit No. SWRCB-102. Parties in the hearing who plan to use the Final EIR/FEIS in their testimony are requested to use this identification when introducing the document(s) by reference. Other party exhibit identification numbers will not be allowed for these documents.


Executive Summary and Table of Contents

Name Date Size
Introduction to Final EIR-EIS 12/22/2016 1.20 MB
Final EIR-EIS Table of Contents and Acronyms 12/22/2016 1.77 MB
Final EIR-EIS Executive Summary 12/22/2016 2.23 MB
Final EIR-EIS Executive Summary Figures 12/22/2016 11.95 MB

Chapter 1 - Introduction
Provides background, including information on the BDCP’s relationship to the Delta Reform Act and Delta Plan, project area description, intended uses of the EIR/EIS, and agency roles and responsibilities. Also includes an overview of the project approval process, use of the EIR/EIS by other entities, and issues of known controversy.

Name Date Size
Final EIR-EIS Chapter 1 - Introduction 12/22/2016 0.60 MB
Final EIR-EIS Chapter 1 - Figures 12/22/2016 20.85 MB
Final EIR-EIS Appendix 1A - Primer on California Water Delivery Systems and the Delta 12/22/2016 14.59 MB
Final EIR-EIS Appendix 1B - Water Storage 12/22/2016 0.47 MB
Final EIR-EIS Appendix 1C-Demand Management Measures 12/22/2016 1.62 MB
Final EIR-EIS Appendix 1D-Final Scoping Report-1 12/22/2016 26.80 MB
Final EIR-EIS Appendix 1D - Final Scoping Report-2 12/22/2016 34.12 MB
Final EIR-EIS Appendix 1D - Final Scoping Report-3 12/22/2016 17.41 MB
Final EIR-EIS Appendix 1E - Water Transfers in California-Types Recent History and General Regulatory Setting 12/22/2016 0.23 MB
Final EIR-EIS Appendix 1F - Supplemental Information for USACE Permitting Requirements 12/22/2016 0.39 MB

Chapter 2 - Project Objectives and Purpose and Need
Describes the project objectives, purpose, and need within the context of the Delta's history, California water use, the regulatory environment, and ecological conditions.

Name Date Size
Final EIR-EIS Chapter 2 - Project Objectives and Purpose and Need 12/22/2016 0.15 MB

Chapter 3 - Description of Alternatives
Describes the alternatives being considered to meet the project objectives described in Chapter 1.

Name Date Size
Final EIR-EIS Chapter 3 - Description of Alternatives 12/22/2016 2.52 MB
Final EIR-EIS Chapter 3 - Figures 3/29/2017 5.77 MB
Final EIR-EIS Chapter 3 - Mapbook Figures 12/22/2016 31.84 MB
Final EIR-EIS Appendix 3A - Identification of Water Conveyance Alternatives Conservation Measure 1 12/22/2016 1.62 MB
Final EIR-EIS Appendix 3A - Attachment 1 12/22/2016 11.40 MB
Final EIR-EIS Appendix 3A - Attachment 2 thorugh Attachment 5 12/22/2016 30.71 MB
Final EIR-EIS Appendix 3A - Attachment 6 and Attachment 7 12/22/2016 46.34 MB
Final EIR-EIS Appendix 3B - Environmental Commitments AMMs and CMs 12/22/2016 1.65 MB
Final EIR-EIS Appendix 3C - Construction Assumptions for Water Conveyance Facilities 12/22/2016 0.98 MB
Final EIR-EIS Appendix 3D - Defining Exisiting Cond NAA No Project and Cum Impact 12/22/2016 1.10 MB
Final EIR-EIS Appendix 3E - Potential Seismic and Climate Change Risks to SWP-CVP Water Supplies 12/22/2016 6.00 MB
Final EIR-EIS Appendix 3F - Intake Locations Analysis 12/22/2016 7.88 MB
Final EIR-EIS Appendix 3G - Background on the Process of Developing the BDCP Conservation Measures 12/22/2016 0.89 MB
Final EIR-EIS Appendix 3H - Intermediate Forebay Location Analysis 12/22/2016 1.98 MB
Final EIR-EIS Appendix 3I - BDCP Compliance with the 2009 Delta Reform Act 12/22/2016 0.35 MB
Final EIR-EIS Appendix 3J - Alternative 4A (Proposed Project) Compliance with the 2009 Delta Reform Act 12/22/2016 0.19 MB

Chapter 4 - Approach to Environmental Analysis
Provides a framework for the environmental consequences analyses, including any relevant evaluation timeframes, and an overview of the project-level and program-level analysis elements. Also describes the overall organization and content of the resource-specific analyses (Chapters 5–30) and the CEQA determinations (Chapter 31); and an overview of modeling tools and applications.

Name Date Size
Final EIR-EIS Chapter 4 - Approach to the Environmental Analysis 12/22/2016 0.40 MB
Final EIR-EIS Chapter 4 - Figures 12/22/2016 0.15 MB
Final EIR-EIS Appendix 4A - Survey Data 12/22/2016 0.13 MB

Chapter 5 - Water Supply
Provides a description of the environmental setting/affected environment related to water supply that may be influenced by implementation of the BDCP alternatives, including possible changes to water supply conditions.

Name Date Size
Final EIR-EIS Chapter 5 - Water Supply 12/22/2016 2.33 MB
Final EIR-EIS Chapter 5 - Figures 12/22/2016 8.04 MB
Final EIR-EIS Appendix 5A - BDCP-California WaterFix FEIR-FEIS Modeling Technical Appendix - Section A 12/22/2016 3.27 MB
Final EIR-EIS Appendix 5A - CALSIM II and DSM2 Modeling Simulations and Assumptions Appendix - Section B 12/22/2016 5.56 MB
Final EIR-EIS Appendix 5A - Alternative 2D and 5A DSM2 Modeling Updates - Section B Attachment 1 12/22/2016 0.86 MB
Final EIR-EIS Appendix 5A - CALSIM II and DSM2 Modeling Results - Section C Part 1 12/22/2016 39.97 MB
Final EIR-EIS Appendix 5A - CALSIM II and DSM2 Modeling Results - Section C Part 2 12/22/2016 44.62 MB
Final EIR-EIS Appendix 5A - Additional Modeling - Section D 12/22/2016 15.85 MB
Final EIR-EIS Appendix 5A - DSM2 Recalibration - Section D Attachment 1 12/22/2016 17.84 MB
Final EIR-EIS Appendix 5A - Tidal Marsh Restoration Effects - Section D Attachment 2 12/22/2016 47.12 MB
Final EIR-EIS Appendix 5A - UnTRIM SeaLevel Rise Modeling - Section D Attachment 3 12/22/2016 20.16 MB
Final EIR-EIS Appendix 5A - DSM2 Corroboration - Section D Attachment 4 12/22/2016 24.83 MB
Final EIR-EIS Appendix 5A - Tidal Marsh Sensitivity - Section D Attachment 5 12/22/2016 19.71 MB
Final EIR-EIS Appendix 5A - Additional Modeling - Section D Attachment 6 12/22/2016 9.21 MB
Final EIR-EIS Appendix 5A - BDCP CALSIM II Model - Section D Attachment 7 12/22/2016 2.02 MB
Final EIR-EIS Appendix 5B - Reduced South of Delta Water Supplies 12/22/2016 0.56 MB
Final EIR-EIS Appendix 5C - Historical Background of Cross-Delta Water Transfers and Potential Source Regions 12/22/2016 0.47 MB
Final EIR-EIS Appendix 5D - Water Transfer Analysis Methodology and Results 12/22/2016 0.85 MB
Final EIR-EIS Appendix 5E - Supplemental Modeling Related to the SWRCB 12/22/2016 8.65 MB
Final EIR-EIS Appendix 5F - Comparison of FEIRS Alternatives 2D 4A and 5A Modeling Results to RDEIR-SDEIS Modeling Results 12/22/2016 13.18 MB
Final EIR-EIS Appendix 5G - Comparison of FEIRS Alternative 4A Modeling Results to the CA WaterFix Section BA Proposed Action Modeling Results 12/22/2016 5.49 MB

Chapter 6 - Surface Water
Describes the potential changes to surface waters (North Coast, Sacramento River and San Joaquin River basins, including the Delta and Suisun Marsh located at the confluence of the Sacramento and San Joaquin rivers) due to modifications in SWP and CVP water supply operations and implementation of habitat restoration in the Delta and Suisun Marsh identified in the BDCP alternatives.

Name Date Size
Final EIR-EIS Chapter 6 - Surface Water 12/22/2016 2.52 MB
Final EIR-EIS Chapter 6 - Figures 12/22/2016 31.66 MB
Final EIR-EIS Appendix 6A - BDCP California WaterFix Coordination with Flood Management Requirements 12/22/2016 0.60 MB

Chapter 7 - Groundwater
Describes the potential changes to groundwater due to implementation of the BDCP alternatives.

Name Date Size
Final EIR-EIS Chapter 7 - Groundwater 12/22/2016 1.51 MB
Final EIR-EIS Chapter 7 - Figures 12/22/2016 16.54 MB
Final EIR-EIS Appendix 7A - Groundwater Model Documentation 12/22/2016 23.72 MB

Chapter 8 - Water Quality
Defines the environmental setting/affected environment for surface water quality, reviews the environmental and regulatory setting with respect to water quality, and provides an assessment of existing water quality conditions within the project area.

Name Date Size
Final EIR-EIS Chapter 8 - Water Quality 12/22/2016 10.84 MB
Final EIR-EIS Chapter 8 - Figures 12/22/2016 72.41 MB
Final EIR-EIS Appendix 8A - Water Quality Criteria and Objectives 12/22/2016 0.49 MB
Final EIR-EIS Appendix 8B - Summary of Data Availability Used in Environmental Setting 12/22/2016 0.26 MB
Final EIR-EIS Appendix 8C - Screening Analysis 12/22/2016 0.96 MB
Final EIR-EIS Appendix 8D - Source Water Fingerprinting Results 12/22/2016 35.90 MB
Final EIR-EIS Appendix 8E - Bromide 12/22/2016 0.73 MB
Final EIR-EIS Appendix 8F - Boron 12/22/2016 5.55 MB
Final EIR-EIS Appendix 8G - Chloride 12/22/2016 7.58 MB
Final EIR-EIS Appendix 8H - Electrical Conductivity 12/22/2016 3.91 MB
Final EIR-EIS Appendix 8I - Mercury 12/22/2016 1.26 MB
Final EIR-EIS Appendix 8J - Nitrate 12/22/2016 5.61 MB
Final EIR-EIS Appendix 8K - Organic Carbon 12/22/2016 0.47 MB
Final EIR-EIS Appendix 8L - Pesticides 12/22/2016 0.14 MB
Final EIR-EIS Appendix 8M - Selenium 12/22/2016 2.50 MB
Final EIR-EIS Appendix 8N - Trace Metals 12/22/2016 0.22 MB
Final EIR-EIS Appendix 8O - San Francisco Bay Analysis 12/22/2016 0.15 MB
Final EIR-EIS Appendix 8P - Velocity Probability of Exceedance Curves 12/22/2016 0.27 MB

Chapter 9 - Geology and Seismicity
Describes the existing geologic and seismologic conditions and the associated potential geologic, seismic, and geotechnical hazards in the Delta and Suisun Marsh area.

Name Date Size
Final EIR-EIS Chapter 9 - Geology and Seismicity 12/22/2016 2.91 MB
Final EIR-EIS Chapter 9 - Figures 12/22/2016 19.63 MB

Chapter 10 - Soils
Provides information on soils in the Plan Area which includes portions of the Delta, Suisun Marsh, and Yolo Bypass.

Name Date Size
Final EIR-EIS Chapter 10 - Soils 12/22/2016 1.82 MB
Final EIR-EIS Chapter 10 - Figures 12/22/2016 25.50 MB
Final EIR-EIS Appendices 10A 10B and 10C 12/22/2016 1.18 MB

Chapter 11 - Fish and Aquatic Resources
Describes the area of potential environmental effects relative to fish and aquatic resources as they may be impacted by the BDCP alternatives.

Name Date Size
Final EIR-EIS Chapter 11 - Fish and Aquatic Resources 12/22/2016 31.75 MB
Final EIR-EIS Chapter 11- Figures 12/22/2016 6.04 MB
Final EIR-EIS Appendix 11A - Covered Fish Species Descriptions 12/22/2016 1.93 MB
Final EIR-EIS Appendix 11B - Non-Covered Fish and Aquatic Species Descriptions 12/22/2016 0.27 MB
Final EIR-EIS Appendix 11C - CALSIM II Model Results Utilized in the Fish Analysis 12/22/2016 16.23 MB
Final EIR-EIS Appendix 11D - Sacramento River Water Quality Model 12/22/2016 11.95 MB
Final EIR-EIS Appendix 11E - Sensitivity Analysis 12/22/2016 0.22 MB
Final EIR-EIS Appendix 11F - Substantive BDCP Revisions 12/22/2016 5.68 MB
Final EIR-EIS Appendix 11F - ADA Compliant - Substantive BDCP Revisions 12/22/2016 5.81 MB
Final EIR-EIS Appendix 11G - Supplemental Modeling Results at ELT for Alternative 4 at H1 and H2 12/22/2016 2.71 MB

Chapter 12 - Terrestrial Biological Resources
Describes the environmental setting/affected environment for the terrestrial biological resources present in the BDCP Plan Area.

Name Date Size
Final EIR-EIS Chapter 12 - Terrestrial Biological Resources 12/22/2016 32.32 MB
Final EIR-EIS Chapter 12 - Figures 12/22/2016 23.93 MB
Final EIR-EIS Chapter 12 - Mapbook Figures 12/22/2016 12.80 MB
Final EIR-EIS Appendix 12A - Special-Status Species with Potential to Occur in the Study Area 12/22/2016 0.53 MB
Final EIR-EIS Appendix 12B - Common and Scientific Names of Terrestrial Species 12/22/2016 0.23 MB
Final EIR-EIS Appendix 12C - 2009 to 2011 BDCP EIR-EIS Environmental Data Report 12/22/2016 31.81 MB
Final EIR-EIS Appendix 12D - Feasibility Assessment of Conservation Measures 12/22/2016 8.91 MB
Final EIR-EIS Appendix 12E - Detailed Accounting of Direct Effects of Alternatives 12/22/2016 20.56 MB

Chapter 13 - Land Use
Describes existing land uses and planned future land uses that could be affected by construction and operation of the alternatives. Summarizes goals, objectives, and policies from the general plans and other regulations of entities with jurisdiction in the Delta, Suisun Marsh, and Yolo Bypass upstream of the statutory Delta.

Name Date Size
Final EIR-EIS Chapter 13 - Land Use 12/22/2016 2.22 MB
Final EIR-EIS Chapter 13 - Figures 12/22/2016 8.48 MB
Final EIR-EIS Chapter 13 - Mapbook Figures 12/22/2016 13.02 MB

Chapter 14 - Agricultural Resources 
Describes the agricultural resources within the study area, specifically the Delta Region, along with areas in Suisun Marsh and the Yolo Bypass covered by Restoration Opportunity Areas (ROAs) identified in the BDCP. Specific impacts to agriculture may also be discussed in Chapters 5, 16, and 30 of the EIR/EIS.

Name Date Size
Final EIR-EIS Chapter 14 - Agricultural Resources 12/22/2016 2.38 MB
Final EIR-EIS Chapter 14 - Figures 12/22/2016 12.41 MB
Final EIR-EIS Chapter 14 - Mapbook Figures 12/22/2016 25.48 MB
Final EIR-EIS Appendix 14A - Individual Crop Effects as a Result of BDCP Water Conveyance Facility Construction 12/22/2016 0.26 MB
Final EIR-EIS Appendix 14B - Delta Agricultural Stewardship Strategies 12/22/2016 0.30 MB

Chapter 15 - Recreation
Describes the recreation facilities and associated recreation activities and opportunities that could be affected by implementing the alternatives.

Name Date Size
Final EIR-EIS Chapter 15 - Recreation 12/22/2016 4.12 MB
Final EIR-EIS Chapter 15 - Figures 12/22/2016 7.28 MB
Final EIR-EIS Chapter 15 - Mapbook Figures 12/22/2016 13.21 MB
Final EIR-EIS Appendix 15A - Privately Owned Recreation Facilities by County 12/22/2016 0.20 MB
Final EIR-EIS Appendix 15B - Delta Recreation 12/22/2016 0.20 MB
Final EIR-EIS Appendix 15C - Additional Recreation Figures 12/22/2016 1.71 MB

Chapter 16 - Socioeconomics
Describes the socioeconomic conditions for the Delta including both quantitative and qualitative measures, and focuses on community character, social and economic characteristics, population, housing, employment, and income at regional levels.

Name Date Size
Final EIR-EIS Chapter 16 - Socioeconomics 12/22/2016 3.08 MB
Final EIR-EIS Chapter 16 - Figures 12/22/2016 0.16 MB
Final EIR-EIS Appendix 16A - Regional Economic Impacts of Water Conveyance Facility Construction 12/22/2016 0.46 MB
Final EIR-EIS Appendix 16B - Community Characterization Photographs 12/22/2016 1.17 MB

Chapter 17 - Aesthetics and Visual Resources
Identifies the study area visual resources that could be affected by implementing the alternatives.

Name Date Size
Final EIR-EIS Chapter 17 - Aesthetics and Visual Resources 12/22/2016 3.24 MB
Final EIR-EIS Chapter 17 - Figures 12/22/2016 14.14 MB
Final EIR-EIS Appendix 17A - Candidate KOP Sensitivity Matrix Ratings 12/22/2016 0.55 MB
Final EIR-EIS Appendix 17B - Photo Simulation Data Sources and Assumptions 12/22/2016 0.14 MB
Final EIR-EIS Appendix 17C - Scenic Quality Rating Summaries 12/22/2016 5.29 MB
Final EIR-EIS Appendix 17D - Permanent Impacts after Construction is Complete 12/22/2016 1.98 MB
Final EIR-EIS Appendix 17E - Permanent Features 12/22/2016 0.55 MB
Final EIR-EIS Appendix 17F – Surge Tower Shadow Data Sources and Assumptions 12/22/2016 2.33 MB

Chapter 18 - Cultural Resources
Provides an overview of the methods used to identify the kind and density of cultural resources in the Plan Area.

Name Date Size
Final EIR-EIS Chapter 18 - Cultural Resources 12/22/2016 2.21 MB
Final EIR-EIS Appendix 18A - Archaeological Resources Sensitivity Assessment 12/22/2016 3.38 MB
Final EIR-EIS Appendix 18B - Identified Resources Potentially Affected by the BDCP Alternatives 12/22/2016 0.97 MB

Chapter 19 - Transportation
Describes the transportation facilities that could be affected by implementing the alternatives.

Name Date Size
Final EIR-EIS Chapter 19 - Transportation 12/22/2016 4.46 MB
Final EIR-EIS Chapter 19 - Figures 12/22/2016 21.64 MB
Final EIR-EIS Appendix 19A - Bay Delta Conservation Plan Construction Traffic Impact Analysis 12/22/2016 23.88 MB

Chapter 20 - Public Services and Utilities
Describes public services and utilities in the Plan Area that could be affected by construction and operation of the action alternatives in the Delta, the Suisun Marsh, and portions of the Yolo Bypass. Public services include law enforcement, fire protection and emergency response, hospitals and medical services facilities, public schools, and libraries. Utilities include solid waste management, water supply and treatment, wastewater treatment, energy, and communications.

Name Date Size
Final EIR-EIS Chapter 20 - Public Services and Utilities 12/22/2016 1.96 MB
Final EIR-EIS Chapter 20 - Figures 12/22/2016 20.46 MB
Final EIR-EIS Appendix 20A - Details of Public Services and Utilities Supporting the Plan Area 12/22/2016 0.48 MB

Chapter 21 - Energy
Discusses the existing conditions for energy generation at the SWP and CVP hydropower facilities and the existing energy use for pumping existing water supplies into the various canals and tunnels in the existing water conveyance and distribution systems.

Name Date Size
Final EIR-EIS Chapter 21 - Energy 12/22/2016 1.12 MB
Final EIR-EIS Chapter 21 - Figures 12/22/2016 0.57 MB

Chapter 22 - Air Quality and Greenhouse Gases
Describes existing conditions related to air quality in the air quality study area. It also discusses federal, state, and local regulations related to air quality that would apply to the alternatives.

Name Date Size
Final EIR-EIS Chapter 22 - Air Quality and Greenhouse Gases 12/22/2016 6.77 MB
Final EIR-EIS Chapter 22 - Figures 12/22/2016 5.81 MB
Final EIR-EIS Appendix 22A - Air Quality Analysis Methodology 12/22/2016 0.32 MB
Final EIR-EIS Appendix 22B - Air Quality Assumptions 12/22/2016 7.93 MB
Final EIR-EIS Appendix 22C - Health Risk Assessment 12/22/2016 9.07 MB
Final EIR-EIS Appendix 22D - DWR Climate Action Plan 12/22/2016 1.59 MB
Final EIR-EIS Appendix 22E - General Conformity Determination 12/22/2016 3.55 MB

Chapter 23 - Noise
Describes the existing noise environment in the noise study area, and identifies receptors that may potentially be affected by noise. It evaluates noise-sensitive receptors associated with residential and recreational land uses in the Delta and the potential effects of Conservation Measure 1 on these receptors.

Name Date Size
Final EIR-EIS Chapter 23 - Noise 12/22/2016 2.38 MB
Final EIR-EIS Chapter 23 - Figures 12/22/2016 0.19 MB
Final EIR-EIS Appendix 23A - Noise Contours - Construction 12/22/2016 9.59 MB
Final EIR-EIS Appendix 23B - Noise Contours - Operations 12/22/2016 1.52 MB

Chapter 24 - Hazards and Hazardous Materials
Discusses existing study area characteristics as they pertain to hazards and hazardous materials, federal, state and local regulations applicable to the use, storage and disposal of hazardous materials, the potential effects on the public and the environment from hazards and hazardous materials associated with implementation of the proposed alternatives, as well as potential mitigation measures to reduce the severity of these effects.

Name Date Size
Final EIR-EIS Chapter 24 - Hazards 12/22/2016 2.48 MB
Final EIR-EIS Chapter 24 - Figures 12/22/2016 4.58 MB
Final EIR-EIS Appendix 24A - Draft Phase 1 Initial Site Assessment 12/22/2016 17.61 MB
Final EIR-EIS Appendix 24B - 2010 Initial Site Assessment 12/22/2016 20.95 MB

Chapter 25 - Public Health
Focuses on issues related to human health and safety that could potentially be affected by the implementation of the BDCP alternatives.

Name Date Size
Final EIR-EIS Chapter 25 - Public Health 12/22/2016 2.73 MB
Final EIR-EIS Chapter 25 - Figures 12/22/2016 7.01 MB

Chapter 26 - Mineral Resources
Describes existing mineral resources within the mineral resources study area that could be affected by construction and operation of the BDCP alternatives.

Name Date Size
Final EIR-EIS Chapter 26 - Mineral Resources 12/22/2016 1.52 MB
Final EIR-EIS Chapter 26 - Figures 12/22/2016 7.45 MB
Final EIR-EIS Appendix 26A - Natural Gas Wells 12/22/2016 0.33 MB

Chapter 27 - Paleontological Resources
Addresses paleontological resources and the potential effects of the BDCP alternatives on paleontological resources in the Delta and Suisun Marsh.

Name Date Size
Final EIR-EIS Chapter 27 - Paleontological Resources 12/22/2016 1.38 MB
Final EIR-EIS Chapter 27 - Figures 12/22/2016 8.18 MB

Chapter 28 - Environmental Justice
Analyzes the potential for the BDCP alternatives to cause disproportionately high and adverse human health or environmental effects on minority and low‐income populations.

Name Date Size
Final EIR-EIS Chapter 28 - Environmental Justice 12/22/2016 1.63 MB
Final EIR-EIS Chapter 28 - Figures 12/22/2016 7.23 MB
Final EIR-EIS Appendix 28A - Census Data 12/22/2016 1.85 MB

Chapter 29 - Climate Change
Presents a discussion of the scientific fundamentals pertaining to climate change that relate to the study area; key regulatory documents associated with adaptation; linkages between resource areas addressed in this EIR/EIS and climate change; and an evaluation of the resiliency of each resource area under each project alternative to potential changes in climate.

Name Date Size
Final EIR-EIS Chapter 29 - Climate Change 12/22/2016 0.47 MB
Final EIR-EIS Chapter 29 - Figures 12/22/2016 4.26 MB
Final EIR-EIS Appendix 29A - Effects of Sea Level Rise on Delta Tidal Flows and Salinity 12/22/2016 1.65 MB
Final EIR-EIS Appendix 29B - Climate Change Effects on Hydrology in the Study Area Used for CALSIM 12/22/2016 2.13 MB
Final EIR-EIS Appendix 29C - Climate Change and the Effects of Reservoir Operations on Water Temperatures in the Study Area 12/22/2016 10.54 MB
Final EIR-EIS Appendix 29D - Climate Change Analysis and Discussion of Future Uncertainty 12/22/2016 0.25 MB

Chapter 30 - Growth Inducement
Addresses the direct and indirect growth inducement potential of the BDCP alternatives. Assessing growth inducement potential involves determining whether project implementation would directly or indirectly support economic expansion, population growth, or residential construction, and, if so, determining the magnitude and nature, and potential environmental effects of that growth.

Name Date Size
Final EIR-EIS Chapter 30 - Growth Inducement and Other Indirect Effects 12/22/2016 1.31 MB
Final EIR-EIS Chapter 30 - Figures 12/22/2016 0.51 MB
Final EIR-EIS Appendix 30A - Population Density in Hydrologic Regions 12/22/2016 1.98 MB
Final EIR-EIS Appendix 30B - Water Contractor Profiles 12/22/2016 5.73 MB
Final EIR-EIS Appendix 30C - Summary of Secondary Effects of Growth 12/22/2016 0.82 MB

Chapter 31 - Other CEQA/NEPA Required Sections
Provides an overview of other CEQA and NEPA considerations based on the technical analyses presented in Chapters 5–30, and addresses significant irreversible and irretrievable changes, and short-term uses versus long‐term productivity, selection of the environmentally superior/preferable alternative, and significant and unavoidable impacts.

Name Date Size
Final EIR-EIS Chapter 31 - Other CEQA NEPA Required Sections 12/22/2012 1.01 MB
Final EIR-EIS Appendix 31A - BDCP Later CM Activity Environmental Checklist 12/22/2012 0.67 MB
Final EIR-EIS Appendix 31B - Mitigation Measure WQ-7e 12/22/2012 18.22 MB

Chapter 32 - Public Involvement, Consultation, and Coordination
Provides a summary of the public involvement and outreach activities (including outreach to the federal and state agencies participating in the CEQA and NEPA processes) conducted for the BDCP EIR/EIS.

Name Date Size
Final EIR-EIS Chapter 32 - Public Involvement - Consultation - and Coordination 12/22/2012 0.34 MB
Final EIR-EIS Appendix 32A - Public Involvement Informational Materials 12/22/2012 24.47 MB
Final EIR-EIS Appendix 32B - Draft EIR-EIS Public Review Summary Report Part 1 12/22/2012 38.20 MB
Final EIR-EIS Appendix 32B - Draft EIR-EIS Public Review Summary Report Part 2 12/22/2012 34.83 MB
Final EIR-EIS Appendix 32C - RDEIR-SDEIS Public Review Summary Report 12/22/2012 19.28 MB

Chapter 33 - List of Preparers

Name Date Size
Final EIR-EIS Chapter 33 - List of Preparers 12/22/2016 0.46 MB

Chapter 34 - References

Name Date Size
Final EIR-EIS Chapter 34 - References Cited 12/22/2012 1.55 MB

Chapter 35 - Glossary

Name Date Size
Final EIR-EIS Chapter 35 - Glossary 12/22/2012 0.63 MB

Index

Name Date Size
Final EIR-EIS Index 12/22/2012 0.94 MB

Mitigation, Monitoring and Reporting Program - California WaterFix

Name Date Size
California WaterFix MMRP 12/22/2016 3.07 MB